| Line S3 | |
|---|---|
Line S3 train at Futian station | |
| Overview | |
| Other name | Ziyang Line |
| Status | Operational |
| Owner | City of Chengdu |
| Locale | Chengdu & Ziyang, Sichuan Province |
| Termini | |
| Stations | 7 |
| Service | |
| Type | Rapid transit |
| System | Chengdu Metro |
| Operator | Chengdu Metro Corporation |
Rolling stock | 4-car Type A |
| History | |
| Opened | 29 September 2024 |
| Technical | |
| Line length | 38.7 km (24.0 mi) |
| Num of tracks | 2 |
| Character | Underground and elevated |
| Electrification | Overhead lines, 25 kV AC |
Operating speed | 160 km/h |
Line S3 of the Chengdu Metro (simplified Chinese: 成都地铁S3线; traditional Chinese: 成都地鐵S3線), also known as Ziyang Line (Chinese: 资阳线), is a rapid transit line in Sichuan Province, China. The line is 38.7 km long and connects Futian in Chengdu to Ziyang Bei Station in Ziyang; the line opened on 29 September 2024.
The line will use 160 km/h Type-A trains. The investment is 14.93 billion CNY. The line will have both underground and ground level sections. It also passes through Tuo River between 1st Tuo River Bridge and 3rd Tuo River Bridge.
Total investment for the line is 14.93 billion CNY. 40% is paid by Chengdu; relocation fee in Ziyang is paid by Ziyang Government; 54.1% left is mortgage from bank.
| Station No. | Station name | Transfer | Distance (km) |
Location | ||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| S301 | Futian | 福田 | 18 19 | 0 | Jianyang, Chengdu | |
| S302 | Lujia | 芦葭 | ||||
| S303 | Ziyang Airport Economic Zone | 资阳临空 | Yanjiang, Ziyang | |||
| S304 | Xingfu Avenue | 幸福大道 | ||||
| S305 | Changhong Square | 苌弘广场 | ||||
| S306 | Baotai | 宝台 | ||||
| S307 | Ziyang Bei Station | 资阳北站 | 38.7 | |||
| Operation Phase | Train Type | Cabin number | Operation Speed (km/h) | Frequency (Trains/Hour) | Interval (Mins) | Capacity (Riders/Hour) |
|---|---|---|---|---|---|---|
| Opening Phase | A | 4 | 160 | 6 | 12 | 4500 |
| Short-term | A | 4 | 160 | 12 | 5 | 8900 |
| Long-term | A | 4 | 160 | 15 | 4 | 11100 |
The line uses Type-A trains operating at 160 km/h speed and powered by 25kV AC overhead lines.
The whole line will use 4-car Trains in the opening and foreseeable future, with 11 trains (44 cars) planning to be purchased.
{{cite web}}: CS1 maint: deprecated archival service (link)