Madurai Metro

Madurai Metro
Overview
OwnerTNMRC
Area servedMadurai
LocaleMadurai, Tamil Nadu
Transit typeMass Rapid Transit
Number of lines
3
Line numberPhase-1
* Line 1 (Madurai Metro)
Phase-2
* Line 2 (Madurai Metro)
* Line 3 (Madurai Metro)
Chief executive
Chennai Metro Rail Limited
HeadquartersMadurai metropolitan area
Operation
Began operation
Proposed
Operation will start
Proposed(under review)
OperatorCMRL
Train length3 coaches
Technical
Top speed60 km/h (37 mph)
Madurai Metro
Phase I
Chittampatti
ACRI Madurai
Othakadai
High Court Bench
Uthangudi
Mattuthavani Bus interchange
K Pudur
Commissioner Office
Goripalayam
Simmakkal
Keezhavasal
Meenakshi Temple
Madurai Junction Madurai Junction railway station Periyar Bus Stand
Therkuvasal
Madura College
Vasantha Nagar
Pasumalai
Thiruparankundram Mainline rail interchange
Thirunagar
Thanakankulam
Thoppur
Dharmathupatti
Kappalur
Tirumangalam Mainline rail interchange
Tirumangalam metro depot

Madurai Metro is a proposed rapid transit system for Madurai, Tamil Nadu, India.

As of March 2023, the DPR preparation contract was awarded to Aarvee Associates. It was ready by July 2023, with construction work planned to commence by end of 2024. In December 2024, the DPR for the Madurai Metro was submitted to the Central Government for approval. In February 2025, Officials indicated that the project could receive central government approval within 6 to 9 months and that groundwork for land acquisition and utility shifting would begin soon. In September 2025, an RTI revealed that the Central Government was still reviewing the DPR, leading to public concern over the delays. Additionally, reports emerged of a planning hurdle with the National Highways Authority of India (NHAI) regarding alignment clashes in the Thirumangalam area. As of November 18, 2025, the Union government has rejected the proposed Metro Rail projects for Madurai and Coimbatore, citing that both cities do not meet the population criteria of 2 million (20 lakh) as per the 2011 census. However, the Chennai Metro Rail Limited (CMRL) has stated that this is a temporary rejection and the project is not cancelled, clarifying that the proposals are still under consideration. CMRL also mentioned that they would provide a detailed explanation to the central government about the current population and that the project will continue.

History

Background

As the monorail market is estimated to be ₹72,000 crore (US$10 billion) in India, the then Governor of Tamil Nadu, Banwarilal Purohit announced in Legislative assembly that the Government of Tamil Nadu had decided to do a feasibility study for introducing monorail system in Madurai along with Salem, Thiruchirappalli, and Tirunelveli.

In 2020, the government has earmarked a sum of about ₹60,000 crore (US$8.4 billion) for metro and monorail projects in Tamil Nadu. At that time SASTRA, using Geographical Information System (GIS) tools, had worked out a proposal for a suburban railway route for Madurai City.

Madurai proposed routes for monorail were:

  1. Tirumangalam – Mattuthavani - via. Kappalur, Thirunagar, Thiruparankundram, Palanganatham, TN polytechnic, Madurai Railway station, Simmakkal, Goripalayam, Tallakulam, Madurai Dist court.
  2. Thiruparankundrum – Park Town - via. Thiruparankundrum Temple, Airport, SN College, Avaniapuram, Villapuram, South Gate, Keelavasal, Nelpettai, Goripalayam, Narimedu, Incometax office, Krishnapuram colony, Viswanathapuram, P & T Nagar.
  3. Kochadai – Viraganur - via. Kalavasal, Arappalayam, Ellis Nagar, Madurai Railway station, Vilakuthoon, Keelavasal, Munichalai, Teppakulam.
  4. Vandiyur – Iyer Bungalow - via. Anna Nagar, Suguna stores, Aravind Eye Hospital, K. K. Nagar, Anna Bus stand, GH, Goripalayam, Reserve Line, K. Pudur
  5. Anuppanadi - Koodal Nagar - Via Teppakulam, Anna nagar, Apollo Hospitals, Mattuthavani, Surveyor Colony, Mahatma Gandhi Nagar, Anaiyur
  6. Tirumangalam to Melur - Tirumangalam, Kappalur, Thoppur, Tirunagar, Vadapalanji, Madurai Kamaraj University, Nagamalai, Nagari, Samayanallur, Vilangudi, Koodal nagar, Arappalayam Bus Terminus, Simmakal, Madurai railway Jn, Periyar Bus Terminus, Jaihindpuram, Villapuram, Mahal, Teppakulam, Anna nagar, Vandiyur, Pondy koil, Mattuthavani, High Court, TVS Srichakra, Melur.
  7. Azhagar-koil to Avaniapuram - Azhagarkoil, Moondru Mavadi, K.Pudur, KK Nagar, G.H., Goripalayam, Sellur, Koodal nagar, Arapalayam BS, P.P. chavadi (in Theni main rd), Bye pass rd (Ponmeni), Vasantha Nagar roundana, T V S Nagar, Pykara, Thirupprankundram, Nilaiyur, Airport, Mandela nagar, Transport Nagar (along ring road), Avaniapuram.

Transfer Points were: Avaniyapuram, Goripalayam, Madurai Railway station, Periyar Bus stand, Keelavasal, Anna Nagar, Teppakulam, Mattuthavani, Tiruparankundrum

The Government of Tamilnadu proposed for a Metro Rail in Madurai, the third largest city in the state of Tamilnadu. CMRL releases tender notice for preparing the project's feasibility report in March, 2022 and BARSYL bags the tender to prepare feasibility study with the deadline of May 2022.

Proposed corridors

Phase I

Proposed Metro Rail Routes in Madurai at Phase-1 stage

Madurai Metro
Corridor No Line From To Roads Via Length
(km)
Number of Stations
1 Line-1 Tirumangalam Othakadai Tiruparankundram Road, Mattuthavani High Road AIIMS, Thiruparankundram, Periyar Bus Terminus, MGR Bus Terminus, Meenakshi Temple, Madras High Court- Madurai Bench 31 22

Phase II

Proposed Metro Rail Routes in Madurai at Phase-II stage

Madurai Metro
Corridor No Line From To Via Length
(km)
Number of Stations
2 Line-2 Kattapuli Nagar Madurai International Airport Samayanallur, Paravai, Fatima College, Madurai Junction, MGR Bus Terminus, Meenakshi Temple, Perungudi 20 14
3 Line-3 Manalur Chekanurani Velammal College, Keelavasal, Madurai Junction, MGR Bus Terminus, Meenakshi Temple, Kalavasal, Nagamalai Pudukkottai 23 19

Project timeline

See also