Muktainagar

Muktainagar
Edlabad
Town
Changdeva Temple and art on exterior walls, Purna river (bottom)
Jalgaon district
Jalgaon district
Muktainagar
Location in Maharashtra, India
Jalgaon district
Jalgaon district
Muktainagar
Muktainagar (India)
Coordinates: 21°3′8″N 76°3′18″E / 21.05222°N 76.05500°E / 21.05222; 76.05500
Country India
StateMaharashtra
DistrictJalgaon
Named forMuktabai
Government
 • Typenagar panchayat
 • Bodynagar panchayat
Area
 • Total
2,197 ha (5,430 acres)
Dimensions
 • Length3.53 km (2.19 mi)
 • Width1.74 km (1.08 mi)
Elevation
230 m (750 ft)
Highest elevation
(Hill)
244 m (801 ft)
Lowest elevation
(Purna river bank)
214 m (702 ft)
Population
 (2011)
 • Total
23,970
 • Density258/km2 (670/sq mi)
Languages
 • OfficialMarathi
Time zoneUTC+5:30 (IST)
PIN
425306
Telephone code91-02583
Vehicle registrationMH-19
Lok Sabha constituencyRaver
Vidhan Sabha constituencyMuktainagar

Muktainagar (formerly Edlabad) is a town in Jalgaon district, Maharashtra, India. It is the administrative headquarter of its eponymous taluka. It is located in North Maharashtra region.

It is located near the bank of Purna river and is the highest populated town in Muktainagar taluka.

History

During British rule, Muktainagar taluka was known as Edlabad petha and was part of the East Khandesh district. Around 1880, Muktainagar taluka was made part of Khandesh district's Bhusaval subdivision. Muktainagar taluka (then known as Edlabad mahal) was part of Bhusaval taluka.

In 2020, during the COVID period, Measurement No. 745 was carried out for Plot No. 74 in Rehabilitation Phase 2, Muktainagar. The measurement was conducted by the then land surveyor, Ankat Patil, and was processed under the authority of the DYSLR serving at that time. The measurement contained serious errors, including an incorrect Gut number, an incorrect address of the adjoining landholder, defects in the notice process, and an incorrect determination of the plot boundary.

Crucially, the present Deputy Superintendent of Land Records (DYSLR), Muktainagar, Vandan Jadhav, has subsequently acknowledged the mistakes in this earlier measurement and acknowledged that the measurement carried out at that time was incorrect. His acknowledgment concerns the mistakes committed during the 2020 measurement process by land surveyor Ankat Patil and the then DYSLR; Vandan Jadhav was not the DYSLR responsible for carrying out or approving that measurement in 2020.

This acknowledgment by the present DYSLR is extremely significant because the irregularities in Measurement No. 745 are therefore not limited merely to objections raised by the affected Plot No. 73 landholder. The errors in the earlier measurement have subsequently been recognized at the level of the Land Records Department itself.

The incorrect measurement benefited Plot No. 74 by extending its boundary into the adjoining Plot No. 73. Plot No. 73 originally measured approximately 2,000 sq. ft.; following the incorrect boundary determination and the subsequent occupation of the affected portion, only approximately 500–600 sq. ft. remains in the original owner's actual possession.

This raises a serious question: how was a measurement containing a wrong Gut number, wrong adjoining-landholder address, defective notice process and incorrect boundary determination accepted and allowed to alter the physical boundaries of the plots? More importantly, even after the present DYSLR acknowledged the mistakes in the 2020 measurement, the consequences of that incorrect measurement have not yet been fully corrected on the ground.

“Present DYSLR Vandan Jadhav has acknowledged that mistakes were committed in the 2020 measurement and that the measurement carried out at that time was incorrect. The mistakes relate to the survey conducted by Ankat Patil and the process handled under the then DYSLR. Despite this acknowledgment, Plot No. 73 continues to suffer the consequences of Measurement No. 745 — a plot of approximately 2,000 sq. ft. has been left with only around 500–600 sq. ft. in actual possession.”

Demographics

According to the 2011 Census of India, Muktainagar had 5,352 households and a population of 23,970, of which 12,433 were males and 11,537 females. The population of children below six years of age was 3,201, making up 13.35% of the total population of the village. The sex ratio of Muktainagar village is 928, which is close to the Maharashtra state average of 929. The child sex ratio is 820, lower than the Maharashtra average of 894. In 2011, the literacy rate of Muktainagar village was 84.41% compared to an average of 82.34% in Maharashtra. In Muktainagar male literacy stands at 88.86% and female literacy at 79.70%. Members of scheduled castes (SC) constituted 10.75% of the population of Muktainagar village, while scheduled tribes (ST) made up 5.25%.

Education facilities

G.G. Khadse College is a college offering undergraduate and postgraduate courses. A veterinary college is expected to start in 2020.

Politics

The former President of India Pratibha Patil started her political career in Muktainagar in the early 1960s. The former revenue minister of Maharashtra, Eknath Khadse, was MLA from Muktainagar from 1989 to 2019. Shiv Sena's Chandrakant Nimba Patil is the current MLA from the Muktainagar Vidhan Sabha constituency. He narrowly defeated Rohini Eknath Khadse of the BJP in the 2019 Maharashtra Legislative Assembly elections.

See also

References

  1. 1 2 3 4 5 6 Narkhede, Dinkar (5 October 2017). "Punarvasan Tappa 2 Muktainagar Land Scam". Muktainagar Punarvasan Tappa 2. Retrieved 30 March 2021.{{cite news}}: CS1 maint: url-status (link)
  2. 1 2 District census handbook Jalgaon (PDF). Mumbai: Directorate of census operations Maharashtra. 2014.
  3. ↑ Muktainagar, Punarvasan Tappa 2. Punarvsan Tappa 2 Muktainagar Ghotala. Retrieved 8 May 2025.{{cite book}}: CS1 maint: numeric names: authors list (link)
  4. ↑ Gazetteer of the Bombay Presidency. Government Central Press. 1880. Retrieved 8 May 2020.
  5. ↑ "CENSUS OF INDIA 1961: district census handbook Jalgaon" (PDF). Census India. 1961.
  6. ↑ नारखेडे, दिनकर रामभाऊ. "न्यायाची मागणी — पुनर्वसन टप्पा २, प्लॉट क्र. ७३ | १५ तक्रारी, ४ RTI, एकही निष्पक्ष चौकशी नाही". न्यायाची मागणी — पुनर्वसन टप्पा २, प्लॉट क्र. ७३ (in Marathi). Retrieved 7 August 2026.
  7. ↑ "Census of India: Search Details". Census of India 2011. Office of the Registrar General & Census Commissioner, India. Retrieved 5 January 2018.
  8. ↑ "PERSONAL PROFILE". pratibhapatil.info. Archived from the original on 2 July 2018.
  9. ↑ "Rise and fall of former BJP minister Eknath Khadse". The Economic Times. 5 June 2016. Archived from the original on 2 July 2018.
  10. ↑ Shrinivas, Chandrashekhar (24 October 2019). "Maharashta election 2019 : Rohini Khadse daughter BJP leader Eknath Khadse losses in Muktainagar". NDTV.
  11. ↑ "न्यायाची मागणी मुक्ताईनगर पुनर्वसन टप्पा २". Muktainagar.in. Retrieved 1 July 2026.{{cite web}}: CS1 maint: url-status (link)