Myponga Dam

Myponga Dam
The dam wall and reservoir, in 2010,
viewed from the lookout
Myponga Dam is located in South Australia
Myponga Dam
Myponga Dam
Location of the dam
in South Australia
Interactive map of Myponga Dam
CountryAustralia
LocationMyponga, Fleurieu Peninsula, South Australia
Coordinates35°24′01″S 138°25′13″E / 35.40035°S 138.420224°E / -35.40035; 138.420224
PurposeWater supply
StatusOperational
Construction began1958
Opening date1962
Built byHansen, Wilkens & Hornibrook Construction
OwnerGovernment of South Australia
OperatorSA Water
Dam and spillways
Type of damArch dam
ImpoundsMyponga River
Height (foundation)49 m (161 ft)
Length226 m (741 ft)
Dam volume54×10^3 m3 (1.9×10^6 cu ft)
Spillway typeControlled
Spillway capacity1,400 m3/s (49,000 cu ft/s)
Reservoir
CreatesMyponga Reservoir
Total capacity27.13 GL (21,990 acre⋅ft)
Active capacity26.8 GL (21,700 acre⋅ft)
Catchment area124 km2 (48 sq mi)
Surface area280 ha (690 acres)
Normal elevation205 m (673 ft) AHD

The Myponga Dam is an arch dam across the Myponga River, located near the eponymous town, on the Fleurieu Peninsula of South Australia. Completed in 1962, the resultant reservoir, the Myponga Reservoir, was established to supplement the supply of potable water to Adelaide, located approximately 60 kilometres (37 mi) to the north.

Overview

The concrete dam wall is 49 metres (161 ft) high and 226 metres (741 ft) long. When full, the reservoir has capacity of 27.13 gigalitres (21,990 acre⋅ft) and covers 280 hectares (690 acres), drawn from a catchment area of 124 square kilometres (48 sq mi). The controlled spillway has a flow capacity of 1,400 cubic metres per second (49,000 cu ft/s). In addition to supplying approximately 5 percent of Adelaide's water supply, the reservoir is the main source of filtered water for southern metropolitan Adelaide and the southern coast area.

Plans to use the Myponga River catchment as a major storage area were made in 1945. Construction began in 1958 and was completed in 1962, flooding what was from 1840 known as "Lovely Valley". Prior to the construction of the Myponga Water Treatment Plant in 1993, water from the Myponga Reservoir was used to supplement the Happy Valley Reservoir.

Search for missing children

The reservoir was searched for the bodies of the Beaumont children, and Joanne Ratcliffe and Kirste Gordon in early 1990, based on evidence against Bevan Spencer von Einem delivered by "Mr. B", a witness. No remains were found there.

Myponga Reservoir seen from Reservoir Road

See also

Myponga Reservoir information