This article needs more citations. (February 2026) |
You can help expand this article with text translated from the corresponding article in Japanese. (December 2008) Click [show] for important translation instructions.
|
| Nabara Dam | |
|---|---|
![]() Interactive map of Nabara Dam | |
| Location | Hiroshima Prefecture, Japan. |
| Construction began | 1971 |
| Opening date | 1976 |
| Dam and spillways | |
| Impounds | Nabara River |
| Height | 85.5 m |
| Length | 305 m |
| Reservoir | |
| Total capacity | 5,568,000 m3 |
| Catchment area | 12.0 km2 |
| Surface area | 24 hectares |
Nabara Dam is a rockfill dam on the Nabara River (also known as Nanbara River) in Hiroshima Prefecture, Japan. It impounds a reservoir that supplies the Nabara pumped-storage hydroelectric power station operated by Chugoku Electric Power Company.
Construction began in 1971 and the dam was completed in 1976, coinciding with the start of commercial operations at the associated power station.
The structure has a height of 85.5 meters and a crest length of 305 meters. The reservoir has a surface area of 24 hectares and total storage capacity of 5,568,000 cubic meters, with a catchment area of 12 square kilometers.
The Nabara Power Station is a pumped-storage facility with an installed capacity of 620 MW, provided by two reversible Francis pump turbines each rated at 310 MW.