New Cruz Azul Stadium

New Cruz Azul Stadium
OwnerCooperativa La Cruz Azul
Capacity40,000–45,000 (planned)
Construction
CostUS$250–300 million (2026 estimate)
Tenant
Cruz Azul (planned)

The New Cruz Azul Stadium is a proposed football stadium intended to serve as the permanent home of the Mexican club Cruz Azul, which has played at rented venues in the Mexico City area since the early 1970s. A stadium was promised under former club president Guillermo Álvarez Cuevas, and the project was revived by his successor, Víctor Velázquez, who presented an architectural preview in May 2024. Several sites in Mexico City and the State of Mexico have been reported or considered, but as of October 2026 the club had not officially confirmed a location and construction had not begun.

History

Background

Cruz Azul moved its home matches from Estadio 10 de Diciembre in Hidalgo to Mexico City in the early 1970s, and has since used venues it does not own, including the Estadio Azteca, the Estadio Azul and the Estadio Olímpico Universitario. In 2024, the club played at the Estadio Ciudad de los Deportes, the former Estadio Azul. It moved to the Estadio Olímpico Universitario before the Clausura 2025 tournament. For the Clausura 2026, it relocated to the Estadio Cuauhtémoc in Puebla, as the Estadio Azteca was being renovated for the 2026 FIFA World Cup. The club returned to the Estadio Azteca for the Apertura 2026 under a new agreement announced on 17 July 2026.

Álvarez Cuevas announced plans for a new stadium on several occasions during his presidency, including a stated intention to begin the project in 2012, but none of these proposals progressed to construction.

Proposals under Velázquez

In April 2024, Velázquez, president of the board of Cooperativa La Cruz Azul, presented the construction of a new stadium to the cooperative's general assembly, which received the proposal favourably. The following month, shortly before the Clausura 2024 final against América, he published a video on social media showing a preview of the architectural project, without giving further details. Later in May, Marco Antonio Rodríguez Hurtado, the mayor on leave of Tlalnepantla de Baz, State of Mexico, said that the stadium would be built in the municipality. The plot, known as El Cerrito, is in San Pedro Barrientos, and the planned complex included a shopping centre, a convention centre and a hotel. The Tlalnepantla project did not proceed.

During 2024 and 2025, sites in the area of the former 18 de Marzo refinery in Azcapotzalco and in La Magdalena Contreras were reported in the press. The mayor of La Magdalena Contreras denied that any plans had been submitted to the borough. In April 2025, Velázquez said that difficulties in acquiring land, together with the club's lease at the Estadio Azteca running until 2031, could delay the project.

In February 2026, Velázquez met the Head of Government of Mexico City, Clara Brugada, to discuss the project. Following a second meeting, the parties agreed to study the viability of a site in Azcapotzalco and that the stadium would be built within Mexico City. Press reports identified the Parque Bicentenario, on the former refinery grounds, as the most advanced option. That same month, the municipal president of Naucalpan, Isaac Montoya, offered two sites in the municipality.

In August 2026, Velázquez said the stadium had initially been announced for the State of Mexico, but that Claudia Sheinbaum, while Head of Government of Mexico City, had asked him to keep it in the capital. He also said that Sheinbaum, by then President of Mexico, had recently asked him whether a site had been found. He described a location in the metropolitan area as preferable for reaching the club's supporters, but said Hidalgo remained a possibility. In October 2026, TUDN journalist Adrián Esparza reported that the club was considering a site in Interlomas, in the municipality of Huixquilucan, State of Mexico, and that it intended to begin construction during 2026. No acquisition of land had been officially announced.

Design

Velázquez has given varying figures for the stadium's capacity. In May 2024, he cited between 35,000 and 45,000 spectators and said the venue would include an adjoining hotel. In April 2026, he gave a figure of between 40,000 and 45,000. His estimates of the construction period, counted from the laying of the first stone, have ranged from two to three years.

Financing

In a 2023 interview with ESPN, Velázquez estimated the cost of the project at between US$300 million and US$350 million. He said the stadium would be wholly owned by Cooperativa La Cruz Azul. In April 2026, he gave a revised estimate of between US$250 million and US$300 million. He stated that financing for the project had been secured and that only the location remained to be decided.

References

  1. 1 2 3 4 5 Ramírez, Miguel (23 April 2026). "Ya tenemos el dinero para nuevo estadio del Cruz Azul". Dinero, Negocios y Finanzas (in Spanish).
  2. 1 2 3 "Nuevo Estadio del Cruz Azul: Dónde será, cuándo empezará su construcción y capacidad". Olympics.com (in Spanish). 17 July 2026. Retrieved 14 October 2026.
  3. 1 2 3 "Cruz Azul presenta adelanto de proyecto de nuevo estadio". ESPN Deportes (in Spanish). 21 May 2024. Retrieved 14 October 2026.
  4. 1 2 3 "Cruz Azul apunta a Interlomas para construir su estadio y Sheinbaum sería clave". El Futbolero (in Spanish). 8 October 2026.
  5. ↑ "Liga MX confirma cambio de estadio de Cruz Azul en el Clausura 2026: Esta es la nueva casa de 'La Máquina'". El Financiero (in Spanish). 8 January 2026.
  6. ↑ Flores Aldana, Omar (27 September 2020). "Billy Álvarez y la promesa del estadio para el Cruz Azul que nunca se cumplió". ESPN México (in Spanish).
  7. 1 2 "¡Costará millones de dólares! Revelan la inversión para nuevo estadio del Cruz Azul en Tlalnepantla". Fox Sports México (in Spanish). 28 May 2024.
  8. ↑ "¿Cuánto costará el estadio de Cruz Azul? Revelan multimillonaria inversión". MedioTiempo (in Spanish). 28 May 2024. Retrieved 14 October 2026.
  9. ↑ "Clara Brugada y Víctor Velázquez se reúnen para analizar dónde construir el nuevo estadio de Cruz Azul en la CDMX". El Imparcial (in Spanish). 5 February 2026.
  10. ↑ Aldana, Karla (30 October 2024). "Revelan el nuevo lugar en donde analizarían construir el estadio de Cruz Azul". Juanfutbol (in Spanish).
  11. ↑ Beristáin, Rubén (3 April 2025). "¿El nuevo estadio de Cruz Azul será en Magdalena Contreras? El Alcalde habló al respecto". Esto (in Spanish).
  12. ↑ Orellana, Alejandro (5 April 2025). "Cruz Azul's new stadium plans face potential delay until 2031 due to real estate hurdles, Estadio Azteca lease, says Victor Velázquez". Goal.
  13. ↑ "Proyecto del estadio de Cruz Azul es una realidad y se anunciaría pronto". MedioTiempo (in Spanish). 5 February 2026. Retrieved 14 October 2026.
  14. ↑ "¿Qué sabemos de la ubicación del nuevo estadio del Cruz Azul?". ESPN Deportes (in Spanish). 5 February 2026. Retrieved 14 October 2026.
  15. ↑ "La sede para el nuevo estadio de Cruz Azul sería el Parque Bicentenario, según reportes". Infobae (in Spanish). 6 February 2026.
  16. ↑ "Cruz Azul recibe dos nuevas ubicaciones para construir su estadio en el Edomex". ADN 40 (in Spanish). 23 February 2026.
  17. ↑ "Víctor Velázquez reitera que nuevo estadio de Cruz Azul estará en CdMx, pero Hidalgo es una posibilidad". Milenio (in Spanish). 25 August 2026. Retrieved 14 October 2026.
  18. ↑ Velázquez, Alejandro (24 August 2026). "¿Estadio de Cruz Azul puede ser construido en Hidalgo? Víctor Velázquez responde". Criterio Hidalgo (in Spanish). Retrieved 14 October 2026.
  19. 1 2 López, Arturo (22 May 2024). "Así será el nuevo estadio de Cruz Azul". Excélsior (in Spanish).
  20. ↑ "Cruz Azul: nuevo estadio costaría hasta 350 millones de dólares". ESPN México (in Spanish). 3 May 2023. Retrieved 14 October 2026.
  21. ↑ "Cruz Azul se debate por estas dos sedes para su nuevo estadio". Azteca Deportes (in Spanish). 4 May 2023. Retrieved 14 October 2026.