Line 22 (Beijing Subway)

Line 22
When Beijing Tongzhou railway station was opened, the sign for Line 22 was already hung
Overview
Other name(s)M22 (planned name)
Pinggu line (construction name)
StatusUnder construction
LocaleChaoyang, Tongzhou and Pinggu districts (Beijing) & Sanhe (Langfang, Hebei Province)
Termini
Stations22
Service
TypeRapid Transit
SystemBeijing Subway
Rolling stock
8-car Type D
History
Planned opening
2026 (planned)
Technical
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationDual voltage 25 kV 50 Hz AC and 1,500 V DC overhead wire
Operating speed
  • 160 km/h (99 mph) (Maximum speed)
  • 120 km/h (75 mph) (Underground section)
Route map

Legend
Future long-term planning expansion
Dongdaqiao
Line 10 (Left arrow inner – outer Right arrow)
Jintai Xizhao
Line 28 (Left arrow Guangqudonglu)
Hongmiao
Ciyunsi Qiao
Ganluyuan
Pingfang depot
Dingfuzhuang
Guaanzhuang
Yongshun
Tongzhou Beiguan
Furong Xilu
Beijing MAC railway station
Luyuan
Luyuandong
Chaobai River – Boundary
Beijing
Hebei
Yanjiaonan
Jingha Railway crossing
Jingtang Intercity Railway crossing
Shenwei Dajie
Chaobai Dajie
Gaolou
Yanjiao Depot
Qixinzhuang
Pinggu Local Railway crossing
Boundary
Hebei
Beijing
Mafang Wuliugang
Daqin Railway crossing
Nongye Zhongguancun
Guononggang
Pinggu
Line 22
Simplified Chinese北京地铁22号线
Transcriptions
Standard Mandarin
Hanyu PinyinBěijīng Dìtiě Èrshí'èr Hào Xiàn

Line 22 of the Beijing Subway is a rapid transit line under construction in Beijing and Hebei Province. It will run from Dongdaqiao station in Chaoyang District to Pinggu station in Pinggu District with 22 stations, including 19 underground stations and 3 elevated stations (Qixinzhuang, Mafang Wuliugang, and Nongyezhongguancun). The length of the line is 81.82 km (50.84 mi), and 53.8 km (33.4 mi) will be underground. The line will use 8-car Type D rolling stock and will open between Hongmiao and Pinggu in late 2026, with Jintai Xizhao and Dongdaqiao stations opening in 2029.

Dingfuzhuang station construction site undertaken by China Railway 18th Bureau (June 2021)

Stations

Station Name Connections Distance
km
Location
English Chinese
Dongdaqiao 东大桥  6   17   28  Chaoyang Beijing
Jintai Xizhao 金台夕照  10   28 
Hongmiao 红庙  14 
Ciyunsi Qiao 慈云寺桥
Ganluyuan 甘露园
Dingfuzhuang 定福庄
Guaanzhuang 管庄  Batong 
Yongshun 永顺 Tongzhou
Tongzhou Beiguan 通州北关  6 
Furong Xilu 芙蓉西路
Beijing Tongzhou Railway Station 北京通州站  M101   6  (via Beiyunhedong)
Luyuan 潞源
Luyuandong 潞源东
Yanjiaonan 燕郊南 Sanhe Langfang, Hebei Province
Shenwei Dajie 神威大街
Chaobai Dajie 潮白大街
Gaolou 高楼
Qixinzhuang 齐心庄
Mafang Wuliugang 马坊物流港 Pinggu Beijing
Nongye Zhongguancun 农业中关村
Guononggang 国农港
Pinggu 平谷

History

The line was originally planned to begin at Dongfeng Beiqiao station and will end at Juhewan station in Pinggu District.

However, in 2019, it was announced that the line will run in a different route. The line will still start in the urban center of Pinggu District. However, when reaching Yanjiao the line will instead head south through Tongzhou District and run under Chaoyang Road between Line 6 and the Batong Line towards Beijing central business district (Beijing CBD). The original plan to terminate the line at Dongfeng Beiqiao station is now reserved as long-term planning. This was done to serve more populated areas of the city and enhance integration between Beijing's city center and its new sub-center in Tongzhou District.

On 25 August 2026, the section from Hongmiao to Pinggu entered the trial operation without passengers.