Parts of this article (those related to article) need to be updated. The reason given is: The SRT has since merged into the national KTX high speed rail network. (September 2026) |
| SRT | |||||
|---|---|---|---|---|---|
SRT train in Suseo station | |||||
| Overview | |||||
| Service type | |||||
| Status | Operating | ||||
| Locale | South Korea | ||||
| First service | 9 December 2016 | ||||
| Last service | 31 August 2026 | ||||
| Successor | KTX (by merger) | ||||
| Route | |||||
| Service frequency |
| ||||
| Train numbers |
| ||||
| Lines used | |||||
| On-board services | |||||
| Classes |
| ||||
| Disabled access | Fully accessible | ||||
| Catering facilities | Trolley service | ||||
| Entertainment facilities | Yes | ||||
| Baggage facilities | Yes | ||||
| Technical | |||||
| Rolling stock |
| ||||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||
| Electrification | 25 kV/60 Hz overhead catenary | ||||
| Operating speed | Up to 305 km/h (190 mph) | ||||
| |||||
| SRT | |
| Hangul | 수서고속철도 |
|---|---|
| Hanja | 水西高速鐵道 |
| RR | Suseo gosok cheoldo |
| MR | Susŏ kosok ch'ŏlto |
The SRT was a high-speed rail service in South Korea operated by SR Corporation. The service starts at Suseo station in southeast Seoul and terminates at either Busan station or Mokpo station.
Around 86% of the train service runs 50 meters underground between Suseo and Cheonan-Asan stations. Dongtan station, the first station after departing from Suseo, is the first underground high-speed railway station in Korea. The SRT runs the Seoul–Busan route 8 minutes faster than KTX as it travels exclusively on dedicated Suseo–Pyeongtaek, Gyeongbu and Honam HSR lines. The Suseo-Pyeongtaek HSR line was built exclusively for this service.
Before the official announcement by SR, Ministry of Land, Infrastructure and Transport used the tentative term Suseo High-speed Railway (수서고속철도).
On October 12, 2015, SR proposed three candidate names for the new high-speed rail service – SRT (Super Rapid Train), HSR (High-speed train of SR), and SRH (SR High-speed train). SRT (Super Rapid Train) was chosen.
On 1 September 2026, the SRT was merged into the main KTX rail network, including operations, ticketing, and rolling stock.
The SRT operates 25 kV AC on the entire line and interconnection with Korail is 1.5 kV DC. At Suseo Station, the power comes from rigid overhead lines before transitioning to a 1500mm overhead catenary wire after leaving the station.
Legend
| ● | All trains stop |
|---|---|
| ○ | Some trains stop |
| △ | Few trains stop |
| Station | Distance (from Suseo) | Stopping | |
|---|---|---|---|
| km | mi | ||
| Suseo | 0.0 | 0.0 | ● |
| Dongtan | 32.6 | 20.2 | ○ |
| PyeongtaekJije | 53.6 | 33.3 | △ |
| Cheonan–Asan | 78.7 | 48.9 | ○ |
| Osong | 107.3 | 66.6 | ○ |
| Daejeon | 142.5 | 88.5 | ● |
| Gimcheon (Gumi) | 216.3 | 134.4 | △ |
| Dongdaegu | 269.4 | 167.3 | ● |
| Gyeongju | 318.4 | 197.8 | ○ |
| Ulsan | 348.4 | 216.4 | ○ |
| Busan | 400.1 | 248.6 | ● |
| Station | Distance (from Suseo) | Stopping | |
|---|---|---|---|
| km | mi | ||
| Suseo | 0.0 | 0.0 | ● |
| Dongtan | 32.6 | 20.2 | ○ |
| PyeongtaekJije | 53.6 | 33.3 | △ |
| Cheonan–Asan | 78.7 | 48.9 | ○ |
| Osong | 107.3 | 66.6 | ○ |
| Gongju | 151.1 | 93.8 | △ |
| Iksan | 197.1 | 122.4 | ● |
| Jeongeup | 239.2 | 148.6 | △ |
| GwangjuSongjeong | 289.7 | 189.0 | ● |
| Naju | 305.5 | 189.8 | △ |
| Mokpo | 356.5 | 221.5 | △ |
The train service is operated using 22 KTX-Sancheon Class 120000 train sets and 10 KTX-Sancheon Class 130000 train sets. Class 120000 train sets was originally operated by Korail's KTX service before it was transferred to SR at the end of 2016, while Class 130000 train sets are new builds.
Since Super Rapid Train only had two routes, there are many local cities that only KTX serves. In November 2016, Jeonju and Yeosu urged the SR Corporation to run trains on the Jeolla Line. In December 2016, the mayor of Pohang proposed running SRT service to Pohang station using the Donghae Line. In January 2021, the mayor of Changwon urged the SR Corporation to run SRT service to Changwon station using the Gyeongjeon Line.
On September 1, 2023, SRT services using Jeolla Line, Donghae Line and Gyeongjeon Line were launched.