Platform | |||||||||||||
| Chinese name | |||||||||||||
| Chinese | 石岩 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Intersection of Shangwu Avenue (上屋大道) and Baoshi East Road (宝石东路) Shiyan Subdistrict, Bao'an District, Shenzhen, Guangdong China | ||||||||||||
| Coordinates | 22°41′1.0″N 113°56′0.1″E / 22.683611°N 113.933361°E | ||||||||||||
| Operator | MTR China Railway Electrification Rail Transit (Shenzhen) Co., Ltd (MTR Rail Transit (Shenzhen) Co., Ltd. and China Railway Electrification Bureau Group Co., Ltd.) | ||||||||||||
| Line | Line 13 | ||||||||||||
| Platforms | 2 (1 island platform) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
Structure type | Underground | ||||||||||||
| Accessible | Yes | ||||||||||||
| History | |||||||||||||
| Opened | 28 December 2025 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Shiyan station (Chinese: 石岩站; pinyin: Shíyán Zhàn; Cantonese Yale: Sehkngǎam Jaahm) is a station on Line 13 of Shenzhen Metro. It opened on 28 December 2025, and is located in Shiyan Subdistrict in Bao'an District.
| G | - | Exits A-D |
| B1F Concourse |
Lobby | Ticket Machines, Customer Service, Station Control Room |
| B2F Platforms |
Platform 1 | |
| Island platform, doors will open on the left | ||
| Platform 2 | 13 towards Lisonglang (Shangwu) | |
The station has 4 points of entry/exit. Exits A and C are equipped with elevators.