| Solar power in Chile | |
|---|---|
| Installed capacity | 11.05 GW (2024) (19th) |
| Annual generation | 19.92 TWh (2024) |
| Capacity per capita | 592 W (2024) |
| Share of electricity | 25.1% (2025) |
Solar power in Chile is an increasingly important source of energy. Total installed photovoltaic (PV) capacity in Chile reached 11.05 GW in 2023. In 2025, solar energy generated 19.92 TWh of electricity in Chile, accounting for 25.1% of total national electricity grid generation, compared to less than 0.1% in 2013.
In October 2015 Chile's Ministry of Energy announced its "Roadmap to 2050: A Sustainable and Inclusive Strategy", which planned for 19% of the country's electricity to be from solar energy, 23% wind power, and 29% hydroelectric power.
In November 2024, Chile's solar power generation capacity was projected to quadruple until 2060, in order to help decarbonize Chile's electricity generation. Energy storage is expected to play a key role by storing a excess electricity generated during the day and releasing it at night. Due to its high solar potential, solar power developments will likely grow most in the north. Solar generation is expected to contribute 46% of Chile's electricity in 2060.
The Catholic University of the North has a leading position in Chile and South America in solar power research. The origin of this research dates back to the early days of the university in the late 1950s and 1960s when a group young researchers dubbed the heliocistas proposed research into solar power in defiance to nuclear power research that was in vougue then. In the 2010s, the development of new more efficient solar power technologies in conjunction with the Fukushima nuclear accident of 2011 cemented the government position in favouring solar power and dissipated a previous pressure that had built to push for nuclear power in Chile.

Northern Chile has the highest solar incidence in the world.
![]()
|
| End of the year | Installed capacity operating | Under construction | Presented for environmental assessment |
|---|---|---|---|
| 2011 | 0 | 1 | <769 |
| 2012 | 2 | 2.5 | 4,109 |
| 2013 | 6.7 | 128 | 8,184 |
| 2014 | 362 | 983 | 12,559 |
| 2015 | 750 | 2380 | 15,769 |
| 2023 | 8500 | 7729 | ? |
This section focuses too much on specific examples. (July 2019) |

In June 2014, the 100-megawatt (MW) Amanecer Solar CAP, a photovoltaic power plant located near Copiapó in the Atacama Desert was inaugurated. It was developed by the company with the same name, Amanecer Solar CAP, and was the largest in Latin America at the time. It is capable of generating 270 gigawatt-hours (GWh) of electricity per year.
The 70 MW photovoltaic Salvador Solar Park went online in November 2014, followed by an official inauguration ceremony on 23 January 2015. It was expected to produce 200 GWh of electricity per year. The plant is located approximately 5 kilometres south of El Salvador, in the Atacama region. It is one of the first in the world to supply competitively priced solar energy to the open market without government subsidy.
The 60 MW photovoltaic Lalackama I plant went online in 2014 and is expected to produce 160 GWh of electricity per year. The nearby 18 MW Lalackama II plant went online in May 2015 and is capable of generating approximately 50 GWh per year. Both plants feature photovoltaic inverters designed and manufactured by Elettronica Santerno, an Italian company.
The 141 MW photovoltaic Luz Del Norte (Light of the North) plant, located 58 kilometres northeast of the city of Copiapó in the Atacama region, began construction in October 2014 and is scheduled for completion in December 2015. It uses more than 1.7 million cadmium telluride modules. The first two blocks of this project (approximately half of the project's total capacity) was connected to Chile's central power grid in October 2015. The plant supplies ancillary grid services.
The 79 MW Pampa Norte PV solar plant began operating in April 2016 at a site 32 kilometres southwest of Taltal in Chile's Antofagasta Region. It uses approximately 258,000 polycrystalline silicon photovoltaic modules and is capable of generating more than 200 GWh per year. The plant was developed by Enel Green Power and features photovoltaic inverters designed and manufactured by Elettronica Santerno.
The 97 MW Carrera Pinto photovoltaic plant is located 60 kilometres from the city of Copiapó in the Atacama Region. The first 20 MW of the plant was connected to the grid in early January 2016, with the remaining 77 MW connected in August 2016. The plant is capable of generating over 260 GWh per year.
The 246 MW El Romero single-axis tracking solar photovoltaic plant began operating in November 2016 at Vallenar in the Atacama region, with a 493 GWh annual average output. It was the largest solar farm in Latin America when it opened. It uses 776,000 polycrystalline silicon photovoltaic modules. The solar irradiance has been measured at 853 W/m2.
In 2016, SolarPack won an electricity auction by bidding $29.1/MWh; a record low price. In March 2020, PV Magazine reported that Solarpack had begun providing power on 2 March 2020, to the Chilean grid from its 123 MW Granja project, 10 months ahead of the contracted date of 1 January 2021. With that, Solarpack raised its total operating capacity in Chile at the time to 181 MW.

In 2013 the Atacama 1 solar complex was proposed as a 110 MW solar thermal electric plant (the first in Latin America) and a 100 MW photovoltaic plant. The solar thermal plant will include 17.5 hours of thermal storage. These technologies complement each other to supply clean and stable energy 24 hours a day. The complex is located in the commune of María Elena, Segunda Región. Construction of the solar thermal electric plant commenced in 2014 and the plant was scheduled to begin operating in the second quarter of 2017, but got delayed significantly. Construction of the photovoltaic plant commenced in January 2015 and the plant began operating in June 2016 with 160 MW of panels, the largest solar plant in Chile at the time. By the end of 2020 the project was fully erected under the name Cerro Dominador Solar Thermal Plant and is expected to fully operate in 2021.
Because of its good solar resource several international companies have bid record low prices for solar thermal power plants in Chile, including the Copiapó Solar Project bid at $63/MWh by SolarReserve in 2017. If realized this would have been the lowest ever price for a CSP project in the world. Several CSP projects are under development in Chile, but in the absence of technology specific support policies Cerro Dominador is the only one under construction, yet.
Some solar facilities also have batteries connected, as they can deliver power after sunset when prices are higher. By August 2025, Chile had 4.6 GWh of battery energy capacity. In 2024 and 2025, around 6 TWh/year of electricity was curtailed (mainly solar in the north) due to insufficient transmission, an increase from 2.7 TWh in 2023.
Oasis de Atacama is a multi-site project with up to 2 GW of solar power and 11 GWh of storage. By early 2025, the first phases (Quillagua and Víctor Jara) were being tested, using lithium iron phosphate (LFP) batteries, and 4 phases operated by 2026.
| Name | Commissioning date | Energy (MWh) | Power (MW) | Duration (hours) | Type | Solar plant (MW) | Location/coords | Notes and refs |
|---|---|---|---|---|---|---|---|---|
| Elena (Oasis de Atacama) | 2026 | 3000 | 430 | 7 | LFP | 446 | María Elena 22°13′S 69°31′W / 22.21°S 69.52°W | solar at night |
| Víctor Jara (Oasis de Atacama) | 2026 | 1300 | 200 | 6 | LFP | 231 | Tarapacá Region | |
| Quillagua (Oasis de Atacama) | 2026 | 1200 | 200 | 6 | LFP | 221 | María Elena 21°40′S 69°30′W / 21.66°S 69.5°W | |
| Gabriela (Oasis de Atacama) | 2026 | 1100 | 220 | 5 | 272 | 3 km above sea level | ||
| Arena | 2026 | 1100 | 220 | 5 | 0 | Antofagasta | ||
| Cristales | 1020 | 340 | 288 | Antofagasta | ||||
| Chaca | 2026 | 912 | 228 | 4 | ||||
| Sol del Desierto | 2025 | 800 | 200 | 4 | Lithium-ion | 244 | María Elena 22°12′22″S 69°34′01″W / 22.206°S 69.567°W | Electric busses |
| Tocopilla | 2026 | 660 | 116 | 5 | 22°06′S 70°13′W / 22.1°S 70.21°W | |||
| Andes Solar IV | 2024 | 650 | 130 | 5 | Lithium-ion | 211 | Calama | |
| Coya | 2024 | 638 | 139 | 4.5 | 181 | María Elena 22°16′S 69°29′W / 22.26°S 69.48°W | ||
| Andes Solar II-b | 2023 | 560 | 112 | 5 | Lithium-ion | 180 | Antofagasta 24°01′S 68°35′W / 24.02°S 68.58°W | |
| Andes III-a | 2026 | 514 | 171 | 3 | 171 | Antofagasta | ||
| Tamaya | 2025 | 418 | 68 | 6 | 114 | Antofagasta 22°10′S 70°05′W / 22.16°S 70.09°W | replaces diesel | |
| Kallpa | 2026 | 285 | 57 | 5 | 344 wind | Taltal | 923 GWh/year | |
| Capricornio | 2025 | 264 | 48 | 5 | 88 | Antofagasta23°25′S 70°11′W / 23.42°S 70.18°W | ||
| Salvador | 2023 | 250 | 50 | 5 | 68 | Diego de Almagro26°18′50″S 69°52′12″W / 26.314°S 69.87°W | ||
| San Andrés | 2024 | 175 | 35 | 5 | 50 | Atacama 27°15′18″S 70°06′18″W / 27.255°S 70.105°W | ||
| Arica | 2026 | 150 | 25 | 6 | Arica | $51 million | ||
| Bolero | 2026 | 438 | 146 | 146 | Sierra Gorda 23°28′S 69°25′W / 23.47°S 69.41°W | $113m, 220kV | ||
| El Manzano | 2025 | 134 | 67 | 2 | 99 | Tiltil | ||
| template | 2026 | 100 | 31 | [[]] |
| Name | Planned commissioning date |
Energy (MWh) | Power (MW) | Duration (hours) | Type | Solar plant (MW) | Location | Refs |
|---|---|---|---|---|---|---|---|---|
| Mesembria | 2025 | 1607 | ||||||
| Patache | 1500 | 300 | 5 | Tarapacá | ||||
| Pampas | 1360 | 340 | 4 | 229 MW + 128 MW wind | Antofagasta | |||
| CEME1-Dune | 2026 | 1334 | 333 | 4 | 480 | María Elena 22°22′S 69°35′W / 22.37°S 69.59°W | Codelco | |
| 2026 | 1000 | 220 | Tarapacá | |||||
| Malgarida | 2027 | 1000 | 200 | 5 | 238 | Diego de Almagro26°16′S 69°58′W / 26.27°S 69.96°W | ||
| Libélula | 960 | 199 | 5 | 151 | Colina and Tiltil | |||
| Monte Águila | 2027 | 960 | 340 | Cabrero, Chile | $300 million cost | |||
| Gran Teno | 2027 | 939 | 241 | 4 | [[]] | |||
| Colbún/Celda | 2026 | 912 | 228 | 4 | Camarones 18°53′S 70°10′W / 18.88°S 70.16°W | |||
| Diego de Almagro Sur | 2027 | 912+32 | 228 | 4 | LFP | 232 | Diego de Almagro 26°35′17″S 69°57′36″W / 26.588°S 69.96°W | |
| Libélula | 2026 | 199 | 151 | Colina y Tiltil | $310 million | |||
| Térmico de Mejillones | 2026 | 800 | 140 | 6 | Mejillones 23°05′13″S 70°24′22″W / 23.087°S 70.406°W | $174 million | ||
| Pampina | 2025 | 700 | 175 | 4 | 186 | María Elena 22°23′S 69°35′W / 22.38°S 69.59°W | Codelco | |
| Luna de Verano | 2027 | 600 | 300 | 2 | 82 | Vallenar | ||
| Atacama II | 600 | 150 | 4 | |||||
| Luz del Norte | 2026 | 423 | 141 | 2 | ||||
| Granja | 2026 | 420 | 105 | 4 | 123 | Tarapacá 20°48′47″S 69°29′13″W / 20.813°S 69.487°W | ||
| Azabache | 2026 | 372 | 94 | 4 | 58 + 36 MW wind | Calama | ||
| Maitenes | 2026 | 360 | 90 | 4 | 131 | O'Higgins Region | ||
| Huatacondo | 2026 | 312 | 98 | 3 | LFP | 103 | Tarapacá 21°08′S 69°28′W / 21.13°S 69.47°W | |
| Arenales | 2026 | 900 | 300 | 3 | 0 | |||
| Los Loros | 2026 | 230 | 46 | 5 | Tierra Amarilla | $64 million | ||
| Las Salinas | 2026 | 800 | 205 | solar, 112 MW wind | Sierra Gorda, Antofagasta 22°51′S 68°57′W / 22.85°S 68.95°W | |||
| 2026 | 100 | 31 | [[]] |
| Name | Planned commissioning date |
Energy (MWh) | Power (MW) | Duration (hours) | Type | Solar plant (MW) | Location/coords | Refs |
|---|---|---|---|---|---|---|---|---|
| Antofagasta ERNC/HREP | 2027 | 4950 | 990 | 5 | 1200 solar&wind | Antofagasta | ||
| Llanura | 3830 | 1000 MW + 150 MW wind | Antofagasta | Llullaillaco 500 kV line | ||||
| Kanut | 2027 | 1900 | 380 | 5 | La Ligua | |||
| Estepa | 2027 | 1672 | 418 | 4 | 215 | María Elena 22°14′49″S 69°33′36″W / 22.247°S 69.56°W | 450 GWh/year. $510 million | |
| Black | 2027 | 1400 | 350 | 4 | Camarones | $220 million | ||
| La Isla | 2027 | 1250 | 250 | 5 | LFP | 0 | Llay-Llay | |
| Los Boldos | 2027 | 1236 | 252 | 4.5 | 300 | Petorca Province | ||
| Terrazas | 2027 | 1240 | 280 | Coquimbo | ||||
| Monte Águila | 2027 | 1100 | 340 | [[]] | ||||
| Pampino | 2029 | 1000 | 170 | Pozo Almonte | ||||
| Huañil | 2027 | 1000 | 200 | 5 | 31 | Salamanca, Chile | $188 million | |
| Plus Energía Camarones | 2028 | 1000 | 200 | 5 | Coquimbo | $350 million | ||
| El Romero | 2028 | 980 | 196 | 5 | 246 | Vallenar | ||
| Melipilla | 2026 | 922 | 120 | 7 | Melipilla | |||
| Nueva Pozo Almonte substation | 2026 | 762 | 190 | 4 | LFP | 0 | Pozo Almonte 20°19′S 69°42′W / 20.32°S 69.7°W | |
| Cabo Leones | 202x | 680 | 170 | 4 | 192 wind | Atacama | ||
| Freirina | 202x | 680 | 170 | 4 | 165 wind | Atacama | ||
| Domeyko | 660 | 300 | 2 | 83 | ||||
| Hemera | 2026 | 541 | 90 | 6 | 94 | Río Claro | ||
| Pradera Larga | 202x | 450 | 90 | 5 | 84 | Valparaíso | ||
| Planchón | 2027 | 400 | 108 | 3.5 | [[]] | |||
| Llanos de Rungue - Halcón 9 | 367 | 69 | 4 | 280 | Andacollo | |||
| Copiapó Solar Project | 2026 | 1280/932 | 340/320 | 4 | 357/330 | Copiapó | 750 GWh/year | |
| Polpaico | 2026 | 300 | Til Til | |||||
| Dorado | 2027 | 300 | 60 | 5 | Quinta de Tilcoco substation | Quinta de Tilcoco | ||
| Quinquimo | 2026 | 200 | 90 | 2 | Lithium-ion | 90 | Valparaíso32°27′S 71°17′W / 32.45°S 71.28°W | |
| Tamango | 2027 | 168 | 49 | [[]] | ||||
| 2026 | 100 | 31 | [[]] | (template) |
624 battery containers housing 6,240 battery units
15-year night-only power purchase agreement
internationally transferred mitigation outcome
The complex combines the 116 MW/660 MWh BESS Tocopilla battery system with flexible natural gas generation infrastructure and a synchronous condenser designed to provide stability services to Chile's National Electric System (SEN). Engie said the conversion required an investment of about $270 million
{{cite web}}: CS1 maint: numeric names: authors list (link)