Dodd was hired by Jet Propulsion Laboratory (JPL) in 1984 as a sequence design engineer for the Voyager 2 during its flyby of Uranus; she became the lead sequence engineer who designed the closest approach sequence for the Neptune flyby. She left Voyager in 1989, and worked on the mission planning team for the failed Mars Observer mission (1990-1993) and on the Cassini mission to Saturn, where she had a team of around 40 people. She worked on Cassini for six years (1993-1999).
Dodd was a project manager of the Spitzer Space Telescope and the manager of the Spitzer Space Telescope Science Center at Caltech since 1999; a project manager of the Nuclear Spectroscopic Telescope Array (NuSTAR) (2012-2016); a manager of NASA's Infrared Processing and Analysis Center (IPAC). In 2010, she became the tenth project manager of the Voyager program. Voyager was already on an extended mission; in 2012 Voyager 1, and in 2018 Voyager 2 crossed the heliopause and entered interstellar space. Theoretically, the spacecraft have enough power until c. 2032; after that there wouldn't be enough power for communication systems. In 2016, she was named the director of JPL's Interplanetary Network Directorate that manages the Deep Space Network (DSN). The farthest spacecraft that "talk" with the DSN are Voyagers.
Forster, Karl; Harrison, Fiona A.; Dodd, Suzanne R.; Stern, Daniel K.; Miyasaka, Hiromasa; Madsen, Kristin K.; Grefenstette, Brian W.; Markwardt, Craig B.; Craig, William W.; Marshall, Francis E. (2014). "NuSTAR observatory science operations: On-orbit acclimation". In Peck, Alison B.; Benn, Chris R.; Seaman, Robert L. (eds.). Observatory Operations: Strategies, Processes, and Systems V. Vol.9149. pp.91490R. doi:10.1117/12.2056916.