| Class overview | |
|---|---|
| Builders | TKMS, Kiel and Wismar |
| Operators | |
| Preceded by | |
| Planned |
|
| On order |
|
| Building | 2 |
| General characteristics | |
| Type | Attack submarine |
| Displacement | 2,500 t (2,500 long tons) surfaced, 2,800 t (2,800 long tons) submerged |
| Length | 73 m (239 ft 6 in) |
| Beam | 10 m (32 ft 10 in) |
| Draught | 7 m (23 ft 0 in) |
| Propulsion |
|
| Speed | > 20 knots (37 km/h; 23 mph) |
| Endurance | 41 days |
| Complement | 27-30 |
| Sensors & processing systems |
|
| Electronic warfare & decoys | Indra Sistemas digital EW systems |
| Armament |
|
The Type 212CD (for Common Design) is a submarine class developed by ThyssenKrupp Marine Systems (TKMS) for the Norwegian and German navies. The class is derived from the Type 212A submarine, but will be significantly larger than the 212A class.
A €5.5 billion contract for development and procurement of the six submarines was placed with TKMS on 8 July 2021 after the German and Norwegian governments reached an agreement in principle in March. This followed an extensive period of negotiation between industry and the two governments which took place after Norway had, in 2017, decided on an extensive naval partnership with Germany and TKMS for their Ula-class replacement project. The Ula-class submarines were also built by TKMS/HDW.[citation needed]
In Kiel, a German-Norwegian Building Program Office (BPO) is to be set up and tasked with representing the two states in matters of design, construction and acceptance. Management will alternate between a German and Norwegian representative, with a third of the staff being Norwegian.[citation needed]
Afterwards, a Lifetime Management Program Office (LMPO) is to be established in Haakonsvern Naval Base. Management will also alternate, with a third of the staff being German. The office is to handle questions concerning maintenance and repairs of the submarines. Norway will establish maintenance facilities for both countries submarines. Construction of the first submarine started in September 2023.
According to the Norwegian Armed Forces Long-Term Plan adopted by the Norwegian Parliament on 4 June 2024, Norway will purchase two more submarines in addition to the four submarines already ordered from Germany.
Norwegian and German U212CD (Common Design) submarines are to be based together in Southern Norway. A Norwegian Ministry of Defence official told Janes on 7 June 2024 that a new base for the U212CD, including infrastructure, would be built at Haakonsvern, where Norway's current Ula-class submarines are already based. The new infrastructure will include pier, maintenance, and test facilities for the U212CD.
The Canadian Patrol Submarine Project (CPSP) was initiated in the 2020s to replace the Victoria-class submarines. In 2023, the Royal Canadian Navy listed 15 requirements on which the contenders would be evaluated. In 2024, a formal request for information was launched.
Canada approached the following manufacturers which offered the following submarines:
Canada short-listed the Type 212CD and the Jang Yeongsil in August 2025. Germany and South Korea started to implement an industrial, technical and capabilities competition to earn the contract.
Canada selected TKMS to build its new submarines in July 2026, joining a trilateral strategic NATO partnership with Germany and Norway. Up to 12 submarines are planned, with at least 5 to be delivered by 2036, including some that were initially planned for the German Navy.
The submarines will be based on, but nearly twice the size of the current Type 212A and features a new stealth design—the hull will be diamond-shaped to reduce its signature on enemy active sonars.
In August 2024, the Norwegian Ministry of Defence announced having completed the design review of the Type 212CD programme. As a result of completing the Critical Design Review (CDR), the production of the submarines will be intensified.
Just like the Type 212A, the submarines will be fitted with a hydrogen fuel cell-based air-independent propulsion system, although they will receive two (MTU 4000 series) diesel engines instead of one. The overall endurance is to be increased as well.
The first batch of German Type 212A uses the MSI-90U Mk 2 CMS combat system which was developed by Kongsberg.
A new combat system ("ORCCA") to be developed by "kta naval systems", a joint venture between TKMS' naval electronics division Atlas Elektronik and Norwegian manufacturer Kongsberg will be installed on the boats and is claimed to allow the analysis of larger amounts of sensor data as well as to improve interoperability with allied forces. The contract was signed in December 2025 (NOK 3.5 billion / €291.8 million).
The ORCCA system is a multidomain system, it can fuse data from other sensors in the air or at the surface.
Two photonics masts including sensors from Hensoldt (OMS 150 and OMS 300) will be used instead of the hull-penetrating periscope of the previous U212A class for search, surveillance and attack functions. A Hensoldt panoramic surveillance system will be installed while Kongsberg will contribute the active SA9510S MKII Mine Avoidance and Navigation Sonar as well as echo sounders for navigation.
The submarines will feature 6 standard torpedo tubes (533 mm (21.0 in)). They are designed to deploy several types of weapons. In terms of torpedoes, a new generation of heavyweight torpedoes is in development DM2A5 (aka CHWT), and an anti-torpedo torpedo is in development, known as the Seaspider. In terms of missiles, it is likely that anti-ship missiles will be launched from the submarine (NSM-SL, 3SM Tyrfing). And an anti-air and anti light vessel missile is in development, derived from the IRIS-T missile, the IDAS.
Underwater drones are planned to be deployed from the Type 212CD. One candidate is the IAI BlueWhale.
The submarines will be built at TKMS's shipyards in Kiel and Wismar. Following Canada's selection of the Type 212CD, TKMS CEO stated that earlier investments in TKMS's shipyards at Kiel and Wismar provided sufficient production capacity to deliver submarines for Germany, Norway, Canada, and future export customers.
From Germany, TKMS, Hensoldt and Atlas Elektronik are some of the main participants to the program. Kongsberg of Norway is participating in the project with production of some of the combat system equipment, sonars and other electronic equipment. Prior to the selection by Canada, several agreements were signed with the Canadian industry to localise the production. It includes:
TKMS signed agreements related to indigenous Canadians developments with:
| Name | No. | Order in class | Status | Contract | Laid down | Launched | Comm. | Notes |
|---|---|---|---|---|---|---|---|---|
| German Navy (6 ordered + 3 planned) | ||||||||
| U-37 | S187 | 3th | Under contract | 30 Aug 2021 | started | – | 2031 | – |
| U-38 | S188 | 5th | – | – | 2034 | |||
| U-39 | S189 | – | Under contract | 19 Dec 2024 | – | – | – | – |
| U-40 | S190 | – | – | – | – | |||
| U-41 | S191 | – | – | – | – | |||
| U-42 | S192 | – | – | – | – | |||
| TBA | TBA | – | Up to 3 additional expected | – | – | – | – | As part of the Zielbild der Marine ab 2035 (Vision for the Navy 2035), Germany plans to have a total of 6 to 9 Type 212 CD, therefore 3 additional submarines might be ordered. |
| TBA | TBA | – | – | – | – | – | ||
| TBA | TBA | – | – | – | – | – | ||
| Royal Norwegian Navy (6 ordered) | ||||||||
| TBA | TBA | 1th | Under construction | 30 Aug 2021 | 12 Sep 2023 | 2027 | 2029 | |
| TBA | TBA | 2th | 2024 | – | 2030 | |||
| TBA | TBA | 4th | Under contract | – | – | 2033 | ||
| TBA | TBA | 6th | – | – | 2035 | |||
| TBA | TBA | – | Under contract | 30 Jan 2026 | – | – | – | |
| TBA | TBA | – | – | – | ||||
| Royal Canadian Navy (12 planned) | ||||||||
| TBA | TBA | – | Selected and in exclusive contract negotiation | – | – | – | – | Contracts to be finalised by the end of 2027, with four submarines delivered by 2034. |
| TBA | TBA | – | – | – | – | – | ||
| TBA | TBA | – | – | – | – | – | ||
| TBA | TBA | – | – | – | – | – | ||
| TBA | TBA | – | – | – | – | – | ||
| TBA | TBA | – | – | – | – | – | ||
| TBA | TBA | – | Additional planned | – | – | – | – | |
| TBA | TBA | – | – | – | – | – | ||
| TBA | TBA | – | – | – | – | – | ||
| TBA | TBA | – | – | – | – | – | ||
| TBA | TBA | – | – | – | – | – | ||
| TBA | TBA | – | – | – | – | – | ||
Equivalent submarines of the same era