Future ORP Wicher before launch | |
| Class overview | |
|---|---|
| Name | Wicher-class frigate |
| Builders | PGZ Stocznia Wojenna, Gdynia |
| Operators | |
| Preceded by | Oliver Hazard Perry class |
| Built | August 2023–present |
| Planned | 3 |
| Building | 3 |
| General characteristics | |
| Type | Guided missile frigate |
| Displacement | 7,000 t (6,900 long tons) |
| Length | 138.7 m (455 ft 1 in) |
| Installed power |
|
| Propulsion |
|
| Speed | In excess of 28 knots (52 km/h; 32 mph) |
| Range | 9,000 nmi (17,000 km; 10,000 mi) |
| Boats & landing craft carried | |
| Complement | 80–100 (accommodation for >180) |
| Sensors & processing systems |
|
| Armament |
|
| Aircraft carried | AgustaWestland AW101 |
| Aviation facilities | Helicopter flight deck and hangar |
The Wicher-class frigate (previously known as the Miecznik class) is a class of frigates being built for the Polish Navy by PGZ Stocznia Wojenna The design is based on the Odense Maritime Technology (OMT) Iver Huitfeldt-class frigate hull and is marketed under the name Arrowhead 140 or Type 31 frigate. Construction on the class began in August 2023.
By the late 2010s, the surface combatant fleet of the Polish Navy faced severe operational aging. The backbone of its escort force relied on two former United States Navy Oliver Hazard Perry class —ORP Generał Kazimierz Pułaski and ORP Generał Tadeusz Kościuszko— which had been acquired second-hand in the early 2000s and were approaching the end of their service lives. These vessels, alongside older Soviet-designed corvette-sized units, lacked modern anti-aircraft warfare (AAW) and anti-submarine warfare (ASW) systems capable of countering modern weapons and systems.
The geopolitical landscape in the Baltic Sea shifted significantly following the annexation of Crimea by the Russian Federation in 2014 and the full-scale Russian invasion of Ukraine in 2022. Securing vital maritime infrastructure—including the Baltic Pipe, offshore wind farms, telecommunications cables, and sea lines of communication to the port of Gdynia and the Świnoujście LNG terminal, became a top defense priority for the Polish Armed Forces.
To address these vulnerabilities, the Polish Ministry of National Defence launched the Miecznik ("Swordfish") program under the Technical Modernization Plan. The initiative aimed to procure three modern multi-role frigates equipped with comprehensive air defense, surface-strike, and anti-submarine capabilities, while simultaneously revitalizing Poland's domestic shipbuilding sector.
Initial market consultations included proposals from major European shipbuilders, including Damen Group (Netherlands) offering the Sigma 10514PL and Naval Group (France) considering to offer their FDI, but in the end chose not to submit their design. By July 2021, the Polish Armaments Agency narrowed the competition down to three shortlisted candidate designs for detailed evaluation:
In March 2022, the Polish government announced the selection of Babcock's Arrowhead 140 design as the baseline platform for the Miecznik program. The decision reflected a strategic partnership with the United Kingdom, which included extensive industrial cooperation, local construction rights, and technical knowledge transfer.
The primary industrial contract was awarded to the PGZ-MIECZNIK Consortium, led by Polska Grupa Zbrojeniowa (PGZ) alongside PGZ Stocznia Wojenna (Naval Shipyard) in Gdynia and Remontowa Shipbuilding. Under the agreement, all three frigates would be built locally at the PGZ Naval Shipyard in Gdynia, triggering significant infrastructure upgrades, including new modern construction halls.
On 16 August 2023, a steel-cutting ceremony took place for the first of the Wicher-class frigates, ORP Wicher. The ceremony was held at PGZ Stocznia Wojenna in Gdynia. The keel laying of Wicher took place on 31 January 2024. Followed by the launch on 13 August 2026. Commissioning is planned for 2029.
Also on 16 August 2023, it was announced that PGZ and Babcock signed an agreement including an option to build five more units. If exercised, this would result in at total of eight Wicher-class vessels being procured by Poland.
At the MSPO 2024 defense expo, it was announced that the Wicher-class frigates will be fitted with Kongsberg's NSM anti-ship missiles instead of Saab's RBS 15 Mk3.
On 9 May 2025, Polish shipbuilder PGZ cut the first steel for the second Wicher-class, ORP Burza. The keel was laid later that year on 18 December 2025.
The third and as of Octeber 2026 final ship of the class, ORP Huragan, started construction on 28 April 2026.
| Name | No. | Builder | Status | Contract | Steel cutting | Laid down | Launched | Comm. | Notes |
|---|---|---|---|---|---|---|---|---|---|
| Wicher (gale) |
274 | PGZ Stocznia Wojenna (shipyard Gdynia) / Babcock International (design) |
Fitting out | 4 Mar 2022 |
16 Aug 2023 |
31 Jan 2024 |
13 Aug 2026 |
2029 |
|
| Burza (Storm) |
275 | Under construction | 5 May 2025 |
18 Dec 2025 |
2030 | ||||
| Huragan (Hurricane) |
276 | Under construction | 28 Apr 2026 |
24 Nov 2026 |
2031 |