Bucharest Ring Motorway

A0 motorway shield}}
A0 motorway
Map of the A0 motorway, as of September 2024
Route information
Maintained by Compania Națională de Administrate a Infrastructurii Rutiere
Length83 km (52 mi)
101 km (63 mi) planned
17.5 km (10.9 mi) under construction
Existed2023–present
Major junctions
Beltway around Bucharest
Major intersections A 1 near Ciorogârla
DN7 near Buftea (under construction)
DN1A near Buftea (under construction)
DN1 near Otopeni
A 3 near Voluntari
DN2 near Afumați
DN3 near Pantelimon (planned)
A 2 near Cernica
DN4 near Popești-Leordeni
DN5 near Jilava
DN6 near Bragadiru
Location
CountryRomania
CountiesIlfov, Giurgiu
Highway system
← A 14→ A 1

The Bucharest Ring Motorway (or the Bucharest Belt Motorway, Romanian: Autostrada Centura București), termed A0, is a partially built motorway ring around the city of Bucharest, the capital of Romania. It is serving as a second, outer ring around the city, the first being the existing Bucharest Ring Road.

It is split into two major sections: the northern and southern half-rings that are each divided into multiple lots. When fully built, it will have a total length of approximately 101 kilometers and will be a motorway connection between the existing A1, A2 and A3 motorways.

As of November 2026, the southern half-ring is fully completed and operational, while on the northern half-ring only one lot is still under construction. A1, A2 and A3 motorways are now connected through A0 using the southern half-ring and the opened parts of the northern half-ring.

Sections

Southern half-ring

The South Ring Motorway (51.3 km) was tendered as a concession contract in December 2012, that was supposed to be awarded in November 2013. Yet, a new tender was announced in July 2017, that shall be completed between the end of 2017 and the first half of 2018, with an estimated cost of 580 million euros. Construction works should take three years and a half to complete. It will run through the south of Bucharest, along the route of the Pan-European Corridor IV.

A tender for a segment of 17.5 km (15.5 km of the South section and 2.5 km of the North section), called lot 3, between the A1 motorway and the DN6 road was launched in July 2017 and awarded in April 2018, to the joint-venture Spedition UMB–Tehnostrade–Artera Proiect, with one year allowed for the design of the motorway and two and a half years for the construction works. However, the bid was challenged and awarded to a new constructor, the Greek company Aktor, in October 2018.

The rest of the South section was tendered on the same date as well, with both of the two bids awarded to the Turkish company Alsim Alarko: the contract for the segment of 16.3 km between the DN6 road and the CFR Line 902 (near Jilava), called lot 2, was signed in March 2019 and is due to be finished in 2022, while the bid for the segment of 16.9 km between the CFR Line 902 and the A2 motorway, called lot 1, was under challenge procedures until July 2019, with the contract being signed one month later.

On 30 December 2023, the first section of the South Ring opened between DN5 and DN6. On 15 April 2024, the second section of the South Ring opened between DN4 and DN5. Later in 2024, the section between DN4 and the A2 motorway would be opened. And in july 2025, the section between DN6 and the A1 motorway would be opened, completing the south ring.

Northern half-ring

Initially, in June 2019, 45 km of the Northern half was tendered for auction into three segments, with a fourth lot included later, up to a total of 49.57 km. On 20 September 2023, the contract for the design and execution of the last segment was signed with the Impresa Pizzarotti – Retter Project management association. On 29 November 2023, the first section opened on the A0, between the A3 motorway and DN1. Later in 2025, the section between DN1 and DN2 is opened.

Openings timeline

Exit list

CountyLocationkmmiDestinationsNotes
GiurgiuJoița0–
100.8
0.0–
62.6
A 1 – Bucharest West, Pitești
Missing connection north-east towards Balotești
IlfovDragomirești-Vale3.52.2Short-term parking
Buftea DN7 – Chitila
DN1A – Mogoșoaia, Buftea
14.59.0Short-term parking
Missing connection south-west towards Joița
Balotești22.213.8 DN1 – Otopeni, Corbeanca, Ploiești
24.315.1Short-term parking
Tunari29.418.3Short-term parking
Ștefăneștii de Jos A 3 – Bucharest North, PloieștiExit for Centrul National de Management Trafic
Afumați36.322.6Short-term parking
3924 DN2 – Voluntari, Urziceni, Buzău
Pantelimon44.727.8Short-term parking
47.629.6 DN3 – Pantelimon, FunduleaPlanned exit
Glina5232 A 2 – Bucharest East, Constanța
55.934.7Short-term parking
Popești-Leordeni DN4 – Popești-Leordeni, Oltenița
64.640.1Short-term parking
1 Decembrie DN5 – Jilava, Giurgiu
Dărăști-Ilfov78.148.5Short-term parking
Bragadiru DN6 – Bragadiru, Alexandria
Clinceni89.4555.58Short-term parking
Ciorogârla94.959.0Short-term parking
GiurgiuJoița100.8–
0
62.6–
0.0
A 1 – Bucharest West, Pitești
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also