| Chennai Metro | |||
|---|---|---|---|
A metro train at Guindy station on the Blue Line | |||
A Phase-2 metro train at Poonamallee depot on Yellow Line | |||
| Overview | |||
| Owner | Chennai Metro Rail Limited | ||
| Locale | Chennai, Tamil Nadu, India | ||
| Transit type | Rapid transit | ||
Number of lines | 3 (operational) 2 (under construction) 1 (under asset transfer) | ||
| Line number | Operational:
| ||
Number of stations | 52 (Operational) + 102 (Under Construction) + 48 (Planned) = 202 | ||
Annual ridership | 125 million (2025) | ||
Key people | Katikithala Srinivas, IAS (Chairman) Ashish Chatterjee, IAS (Managing Director) | ||
| Headquarters | Chennai Metro Rail Limited Head Office, Anna Salai, Nandanam, Chennai 600035 | ||
| Website | chennaimetrorail | ||
| Operation | |||
Began operation | 29 June 2015 | ||
| Operator | Chennai Metro Rail Limited | ||
Number of vehicles | 67 | ||
| Train length | 100 m (330 ft) | ||
| Headway | 6–12 minutes | ||
| Technical | |||
| System length | 68.8 km (42.8 mi) | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
| Electrification | 25 kV 50 Hz AC overhead line | ||
| Top speed | 120 km/h (75 mph) | ||
| |||
The Chennai Metro is a rapid transit system serving the city of Chennai, India. It is operated by Chennai Metro Rail Limited, a joint venture between the Government of India and the Government of Tamil Nadu. As of October 2026, the network consists of three operational lines spanning 68.8 km (42.8 mi) and has 52 underground and elevated stations, making it India's fifth largest metro rail system. The system runs on standard gauge and is powered by 25 kV 50 Hz AC overhead electric lines.
Plans for a metro rail system for Chennai started in 2007–08 with construction commencing in February 2009. Test runs began in 2014, and the first segment of the metro between the Alandur and Koyambedu stations on the Green Line began operations on 29 June 2015. On 21 September 2016, operations on the Blue Line commenced between Chennai Airport and Little Mount. The underground stretch from AG-DMS to Washermanpet of the Blue Line opened on 10 February 2019, completing the first phase. Additionally, The Chennai Metro is the first metro system in India to operate an Inter-Corridor Line system.
As a part of the second phase, three more lines covering a length of 92.8 km (57.7 mi) are planned and are under construction. The Chennai Mass Rapid Transit System (MRTS), operated by the Indian Railways, is planned to be incorporated into the Chennai Metro. A light rail has been proposed to connect Tambaram on the Chennai suburban rail network with Velachery on the MRTS. Further extensions are also planned for the three lines under construction.
A single electrified line from Chennai Beach to Tambaram began operations in 1931 as part of the Chennai Suburban Railway. Two other rail lines were subsequently built, connecting Chennai Central to Gummidipoondi and Tiruvallur in 1979. In 1965, the Planning Commission evaluated the capacity of the transportation network in major metropolitan cities including Madras, and developed plans for further expansion of transportation amenities. As a result, an initial stretch of the Chennai Mass Rapid Transit System (MRTS) between Chennai Beach and Chepauk opened in 1995 – the first elevated rail line in India. The MRTS later extended to Thirumayilai in 1997, to Thiruvanmiyur in 2004, to Velachery in 2007, and St. Thomas Mount in 2026. In 2006, a modern metro rail system for Chennai was planned, to be modeled after the Delhi Metro.
The Delhi Metro Rail Corporation was tasked to prepare a project report for the implementation of a metro rail system in Chennai. The Government of Tamil Nadu approved the first phase of the project in November 2007. The first phase was planned with two lines covering 45.1 km (28.0 mi) with 25 km (16 mi) being underground. The first corridor would connect Washermanpet with Chennai International Airport extending for 23.1 km (14.4 mi) with 14.3 km (8.9 mi) being underground and the second corridor would connect St.Thomas Mount with Chennai Central extending for 22 km (14 mi) with 9.7 km (6.0 mi) being underground. In December 2007, the Chennai Metro Rail Limited (CMRL) was established as a joint venture between the union and state governments to execute the project. The Planning commission gave an in-principle approval for the project in April 2008 with the final approval by the Union Council of Ministers in January 2009. The estimated base cost of the first phase was ₹146 billion (US$1.5 billion) of which 59% was loaned by Japan International Cooperation Agency (JICA). The Government of India contributed 15% of the cost and the Government of Tamil Nadu financed the remaining 21% of the project.


| Year | Scope of contract work | Contractor | Contract Value | Notes |
|---|---|---|---|---|
| February 2009 | Construction of elevated 4.5 km viaduct between Koyambedu and Ashok Nagar along Inner Ring Road | Soma Enterprise | ₹1.99 billion (US$21 million) | |
| March 2009 | Technical consultancy services for Phase 1 project | Egis-led consortium of five companies | US$30 million | |
| August 2010 | Supply of rolling stock metro trainsets | Alstom | US$243 million | |
| January 2011 | Design and construction of tracks and Koyambedu depot | Larsen & Toubro – Alstom joint venture | ₹4.49 billion (US$47 million) | |
| January 2011 | Construction of 9 underground stations and tunnels in Blue and Green lines of Phase 1 | Afcons–Transtonnelstroy | ₹25.97 billion (US$270 million) | |
| January 2011 | Construction of 3 underground stations and tunnels in Green Line of Phase 1 | Larsen & Toubro - SUCG JV | ₹705.75 crore (US$73 million) | |
| February 2011 | Construction of 7 underground stations in Blue Line of Phase 1 | Gammon India and Mosmetrostroy | ₹19.47 billion (US$200 million) | |
| June 2011 | Construction of ten elevated stations | Consolidated Construction Consortium | ₹234.53 crore (US$24 million) | |
| June 2011 | Supply and installation of lifts and escalators | Johnson Lifts – SJEC Corporation joint venture | ||
| June 2011 | Power supply systems and overhead electrification | Siemens | ₹3.05 billion (US$32 million) | |
| June 2011 | Automatic fare collection system | Nippon Signal | ||
| June 2011 | Tunnel ventilation systems | Emirates Trading Agency | ||
| June 2011 | Air conditioning systems | Voltas |
In August 2012, a construction worker was killed and six others were seriously injured after a crane failed and crashed at an under construction site near Pachaiyappa's College and on 10 January 2013, a 22-year-old construction worker was killed and three others were injured at a construction site between Alandur and St. Thomas Mount. On 6 November 2013, a test run was conducted along a stretch of 1 km (0.62 mi) track. The project faced several delays and missed deadlines due to problems with land acquisition and cancellation of construction contracts. On 11 January 2014, a crane toppled over, killing a 20-year-old construction worker and seriously injuring another at Saidapet.
On 14 February 2014, the maiden trial run was conducted between Koyambedu and Ashok Nagar stations. The metro received the statutory speed certification clearance from the Research Design and Standards Organisation in August that year. In January 2015, a report was submitted to the Commissioner of Metro Rail Safety (CMRS) for mandatory safety approvals. After inspecting the infrastructure, the CMRS submitted the report to the Railway Board in April 2015.


Operations on the Green Line between the Alandur and Koyambedu stations commenced on 29 June 2015. The Blue Line segment from the Airport and Little Mount stations commenced operations on 21 September 2016. The first underground section between Thirumangalam to Nehru Park on the Green Line opened on 14 May 2017, and the extension to Chennai central was completed on 25 May 2018 along with the section from the Saidapet and AG-DMS stations on the blue line. On 10 February 2019, the underground stretch from AG-DMS to Washermanpet of Blue Line was opened, marking the completion of the first phase of the metro.
In 2014, a 9 km (5.6 mi) northern extension of the Blue Line was announced by the Government of Tamil Nadu. The extension would run from Washermanpet to Wimco Nagar and consist of nine stations. Construction started in July 2016 with the first trial runs conducted in December 2020. The line opened for passenger traffic on 14 February 2021, increasing the length of the operational metro system to 54.1 km (33.6 mi). The expansion costed ₹37.7 billion (US$390 million) of which 57% was loaned by JICA. In 2021, the CMRL proposed a further extension of the blue line to connect the airport with Kilambakkam at an estimated cost of ₹46.25 billion (US$480 million), which is clubbed with Phase III in 2026.
| Phase 1 (Includes Ph 1 extension) | |||||
|---|---|---|---|---|---|
| Line | Terminals | Stations | Length (km) | Opening Date | |
| Green Line | Koyambedu | Alandur | 7 | 10.26 km (6.38 mi) | 29 June 2015 |
| Alandur | St. Thomas Mount | 1 | 1.42 km (0.88 mi) | 14 October 2016 | |
| Koyambedu | Nehru Park | 7 | 7.39 km (4.59 mi) | 15 May 2017 | |
| Nehru Park | Central | 2 | 2.65 km (1.65 mi) | 25 May 2018 | |
| Blue Line | Chennai Airport | Little Mount | 6 | 8.63 km (5.36 mi) | 21 September 2016 |
| Little Mount | AG–DMS | 4 | 4.82 km (3.00 mi) | 25 May 2018 | |
| AG–DMS | Washermanpet | 7 | 9.81 km (6.10 mi) | 10 February 2019 | |
| Washermanpet | Wimco Nagar | 8 | 8.57 km (5.33 mi) | 14 February 2021 | |
| Wimco Nagar | Wimco Nagar Depot | 1 | 0.5 km (0.31 mi) | 13 March 2022 | |
| Total | 41 | 54.1 km (33.6 mi) | |||
Chennai Metro - Phase II | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
In July 2016, the Government of Tamil Nadu announced that the second phase would have three lines spanning 104 km (65 mi) with 104 stations. Two corridors would extend from Madhavaram Milk Colony connecting with Siruseri SIPCOT and Sholinganallur respectively with the third corridor connecting Koyambedu with Lighthouse on the Marina beach. In July 2017, the state government announced an extension of Phase II, involving a section from Lighthouse up to Poonamallee Bypass with an intersection with the Madhavaram–Sholinganallur line at Alwarthirunagar. The second phase would span 118.9 km (73.9 mi) with 128 stations. The stations for the second phase were designed to be smaller than the stations of the first phase to reduce the cost and time of construction. In 2019, the Madras High Court questioned the state government on the construction method of the tunnels and its impact on the water bodies. The second phase was estimated to cost ₹63.25 billion (US$660 million) of which ₹47.1 billion (US$490 million) was loaned by JICA.
On 20 November 2020, foundation stone for the second phase was laid and construction commenced. On 14 February 2021, Prime Minister of India announced that the government has set aside ₹630 billion (US$6.5 billion) for the construction of the second phase and its further extension. In May 2023, the CMRL announced minor changes to the lines' alignment and that nine stations would be scrapped in the revised plan. Hence, the total length of the second phase was reduced to 116.1 km (72.1 mi).



| Year | Scope of contract work | Contractor | Contract Value | Notes |
|---|---|---|---|---|
| May 2021 | Civil construction of various sections of Phase 2 | Tata Group, Larsen & Toubro (L&T), HCC-KEC | ₹6,427.25 crore (US$670 million) | |
| November 2022 | Rolling stock supply of 78 train sets including 36 driver-less trains | Alstom | ₹798 crore (US$83 million) | |
| December 2022 | Installation of tracks | KEC–Vijay Nirman Company JV | ₹206.64 crore (US$21 million) | |
| December 2022 | Installation of signalling systems | Hitachi | ₹1,620 crore (US$170 million) | |
| January 2023 | Construction of 12 underground stations in Purple Line | Rail Vikas Nigam Limited (RVNL) | ₹4,049.2 crore (US$420 million) | |
| January 2023 | Installation of electric traction systems | Linxon | ||
| May 2023 | Installation of overhead equipment and control and monitoring systems | Larsen & Toubro (L&T) | ₹770 crore (US$80 million) | |
| October 2023 | Construction of 5 underground stations of Red Line | Tata Projects | ₹1,817.54 crore (US$190 million) | |
| December 2023 | Installation of platform screen doors at 36 elevated stations | ST Engineering | ₹159.97 crore (US$17 million) | |
| December 2023 | Installation of automated fare collection systems | Shellinfo | ₹42 crore (US$4.4 million) | |
| March 2024 | Additional supply of 96 train sets | Alstom | ₹1,538.34 crore (US$160 million) |
As of May 2024[update], about 20 km (12 mi) of the second phase had been completed. In March 2025, the first trial run on the Phase II network was conducted on a 3 km (1.9 mi) stretch between Poonamallee and Mullaithottam on the proposed Yellow Line. In April 2025, trial runs began on a 10 km (6.2 mi) stretch between Poonamallee and Porur Junction stations on the same line. The RDSO conducted inspection on the same stretch in August 2025, and the Railway Board provided approval for the operation of signals on the line in December 2025. Following the conclusion of safety checks by the CMRS in February 2026, the operations on Poonamallee Bypass to Vadapalani stretch on the Yellow Line commenced on 11 October 2026., with no intermediate stoppages between Porur and Vadapalani,
| Phase 2 | ||||||
|---|---|---|---|---|---|---|
| Line | Terminals | Length (km) | Stations | Status/Opening date | ||
| Yellow Line | Poonamallee Bypass | Vadapalani | 14.64 km (9.10 mi) | 11 | 11 October 2026 | |
| 6 | Under construction | |||||
| Vadapalani | Lighthouse | 11.5 km (7.1 mi) | 10 | |||
| Purple Line | Madhavaram Milk Colony | Siruseri SIPCOT II | 45.8 km (28.5 mi) | 48 | ||
| Red Line | Madhavaram Milk Colony | Sholinganallur | 47 km (29 mi) | 45 | ||
| Total | 118.9 km (73.9 mi) | 118 | ||||
In 2022, the state government proposed an extension plan spanning 93 km (58 mi) for the three under construction lines of the second phase. The proposal involved extension of Purple Line from Siruseri SIPCOT to Kilambakkam, Yellow Line from Poonamallee to Parandur and Red Line from Koyambedu to Avadi. The proposed extension of second phase lines from Siruseri to Kilambakkam, Poonamallee to Parandur, and Koyambedu to Avadi were projected to cost ₹54.58 billion (US$570 million), ₹107.12 billion (US$1.1 billion), and ₹67.36 billion (US$700 million) respectively. Between late 2023 and early 2024, feasibility reports submitted by the CMRL suggested dropping the proposed extension of the purple line due to economic viability and going ahead with the planned extensions of the other two lines, spanning 59.7 km (37.1 mi). In May 2024, the state government proposed a new 16 km (9.9 mi) extension from Madhavaram to Ennore, which was later changed as Assisi Nagar to Wimco Nagar extension in 2026.
In May 2024, the Government of Tamil Nadu approved both the extensions of the Red Line from Koyambedu to Pattabiram and Yellow Line from Poonamallee to Parandur at an estimated cost of ₹99.28 billion (US$1.0 billion) and ₹159.06 billion (US$1.7 billion) respectively, forwarding to Government of India for final approval. In July 2026, Chennai Metro planned to club Airport - Kilambakkam extension of Phase-I as well as above planned extensions with proposed Phase III network, with few more stretches planned to link northern suburbs of city based on feasibility reports. Koyambedu metro station is set for upgrade with Phase III connectivity (Koyambedu - Pattabiram) with Phase I and Phase II stations of Green Line and Red Line respectively. CMRL also plans extending Airport to Kilambakkam extension further south, till Chengalpattu.
| Phase 3 | ||||||
|---|---|---|---|---|---|---|
| Line | Terminals | Length | Stations | Status | Reference | |
| Blue Line | Chennai Airport | Kilambakkam | 15.46 km (9.61 mi) | 12 | DPR approved by state (awaiting Central govt approval) |
|
| Red Line | Koyambedu | Pattabiram | 21.76 km (13.52 mi) | 19 | ||
| Yellow Line | Poonamallee | Sunguvarchatiram | 27.9 km (17.3 mi) | 14 | ||
| Lighthouse | High Court | 7 km (4.3 mi) | TBD | DPR to be prepared | ||
| TBD | Tambaram | Velachery | 21 km (13 mi) | TBD | ||
| Blue Line | Kilambakkam | Chengalpattu | 25 km (16 mi) | TBD | ||
| Red Line | Assisi Nagar | Wimco Nagar | 11 km (6.8 mi) | TBD | ||

In 2017, the state government proposed to integrate the Chennai Mass Rapid Transit System (MRTS) into the Chennai Metro. In July 2018, PwC said that the merger would cost around ₹30 billion (US$310 million) to convert the rolling stock and install other facilities for the merger. On 11 May 2022, Southern Railway of the Indian Railways granted an in-principle approval for the integration of the MRTS into the metro. As per the plan, the railway would handover the MRTS to the CMRL once the expansion of the MRTS is completed. However, the extended second phase of the MRTS project, connecting Velachery with St. Thomas Mount experienced delays, and was completed in March 2026. Once the takeover is completed, CMRL will upgrade the MRTS system including tracks, security, ticketing system and rolling stock.
In 2020, a light rail was proposed to connect Tambaram railway station of the existing suburban rail network with Velachery on the MRTS, as part of plans to link the different urban transit lines in the city. Feasibility studies for the project was commissioned in February 2023 by the Chennai Unified Metropolitan Transport Authority (CUMTA). In March 2024, a study was commissioned to re-assess the feasibility of establishing a new corridor connecting Tambaram with Velachery with an extension to connect with existing Guindy metro station. In 2025, the government decided to develop the stretch as a regular metro corridor.

The third phase of the Chennai Metro is under planning as a part of the Chennai Comprehensive Mobility Plan, with upgrades to existing Phase-I stations and procurement of 28 new six-coach metro trains. The CMRL is also involved in the feasibility studies for the development of metro rail transport in the cities of Coimbatore, Madurai and Tiruchirapalli.
CMRL developed the Kathipara Urban Square as a multi-modal transport hub with parking and recreational areas. In 2023, the CMRL proposed the development of Central Square around its headquarters with commercial complexes and multi-storied buildings. In April 2025, CMRL announced that it has identified public spaces in Adyar and Velachery which can be transformed into public spaces similar to Kathipara Urban Square.
The Chennai Metro consists of five colour-coded lines developed under two phases. The Blue and Green lines form the Phase I network, while the Purple, Yellow and Red lines are part of the Phase II expansion. The three Phase II corridors have a combined planned length of 118.9 kilometres.
The Blue Line connects Wimco Nagar Depot with Chennai International Airport. It passes through areas including Washermanpet, Chennai Central, Government Estate, Thousand Lights, Teynampet, Saidapet, Guindy and Meenambakkam. The line comprises both elevated and underground sections and provides interchange with the Green Line at Chennai Central and Alandur.
The Green Line extends approximately 22 kilometres from Chennai Central to St. Thomas Mount. The line passes through Egmore, Kilpauk, Anna Nagar, Koyambedu, Vadapalani, Ashok Nagar and Alandur. It includes elevated and underground sections and connects with the Blue Line at Chennai Central and Alandur.
The Purple Line is an under-construction line extending 45.8 kilometres from Madhavaram Milk Colony to Siruseri SIPCOT. The corridor is planned to have 50 stations, including 30 underground and 20 elevated stations. It passes through central Chennai and follows Old Mahabalipuram Road through Perungudi, Thoraipakkam and Sholinganallur, serving the city's southern information technology corridor.
The Yellow Line extends 26.1 kilometres from Lighthouse to Poonamallee Bypass. The line is planned to have 30 stations, including 12 underground and 18 elevated stations. Its route passes through Mylapore, T. Nagar, Kodambakkam, Vadapalani and Porur. The underground section includes stations at Lighthouse, Alwarpet, Nandanam and Panagal Park, while the western section is elevated.
The Red Line is an under-construction line planned to extend 47 kilometres from Madhavaram Milk Colony to Sholinganallur. It will comprise 48 stations, including 42 elevated and six underground stations. The corridor passes through northern and western Chennai before continuing towards the southern suburbs. It will connect with Corridor 3 at Sholinganallur, where a multi-level interchange station is being developed.

Chennai Metro runs on 1,435 mm (4 ft 8+1⁄2 in) standard gauge and the lines are double-tracked. The trains can operate at a maximum speed of 120 km/h (75 mph), and the average operational speed is 85 km/h (53 mph).
As of October 2026, the operational network consists of three colour-coded lines covering a length of 68.8 km (42.8 mi).
| Chennai Metro | ||||||
|---|---|---|---|---|---|---|
| Line | Terminal | First Operational | Last Extension | Length (km) | Stations | |
| Blue Line | Wimco Nagar Depot | Chennai Airport | 21 September 2016 | 13 March 2022 | 32.1 | 26 |
| Green Line | Central | St. Thomas Mount | 29 June 2015 | 25 May 2018 | 22 | 17 |
| Yellow Line | Poonamallee Bypass | Vadapalani | 11 October 2026 | 11 October 2026 | 14.6 | 11 |
| Total | 68.8 km | 52 | ||||

Alstom supplied the rolling stock for the first phase of the Chennai Metro. For the first phase, it supplied 42 train-sets composed of four coaches. The first nine train sets were imported from Brazil and the rest were manufactured at Alstom's facility at Sri City near Chennai. The trains are air-conditioned with electrically operated automated sliding doors. The trains usually have a first class compartment and a dedicated section reserved for women.
The trains operate on 25 kV AC electric traction. The trains are connected to the grid via overhead lines and are equipped with regenerative braking with a capacity to recover 30–35% of the energy during braking. The electricity is supplied by the Tamil Nadu Electricity Board, and the metro system consumed an average of 70 MW of power daily in 2014. Chennai Metro also uses solar power with an installed capacity of 6.4 MWp, which contributed to about 12-15% of the energy requirement of the metro in 2023.
For the second phase, Alstom was awarded a ₹9.47 billion (US$98 million) contract to supply 26 trainsets made of three coaches each to be deployed on the Yellow Line. In November 2024, CMRL awarded a ₹36.58 billion (US$380 million) contract to BEML for the supply of 70 trainsets, made of three coaches each, to be deployed on Red and Purple lines. In June 2025, CMRL placed an additional order of 32 driverless trainsets with Alstom.

A total of 40 stations, 22 of which are underground, are operational on the two lines of the first phase. In the underground sections, a walkway runs along the length of the corridor with cross passages every 250 m (820 ft) for the maintenance and emergency evacuation. The underground stations have an average width of 200 m (660 ft) and are located at an average depth of 6.1 m (20 ft) from the ground level. The average length of the stations in Phase 1 extension is about 180 m (590 ft).
The elevated stations have three levels with the concourse level at a minimum height of 5.5 m (18 ft) above the ground level and platform level above the concourse while the underground stations have two levels and are equipped with platform screen doors. The stations are air-conditioned and are equipped to be disabled and elderly friendly, with automated fare collection, public announcement system, electronic display boards, escalators and lifts. Paid parking facilities are available for two wheelers in most stations and four wheelers in select stations.

Chennai Metro maintains a major depot at Koyambedu which houses maintenance workshops, stabling lines, test tracks and a washing plant for the trains. In 2022, an elevated depot at Wimco Nagar commenced operations with the same facilities. Three new depots at Madhavaram, Poonamallee, and Semmencherry, are planned as a part of the second phase, of which Madhavaram depot is planned to be the largest. The Poonamallee depot was first in Phase II to commence operations with trial runs being conducted since 2024. In 2025, a sixth depot was planned at Pattabiram as a part of the Phase-III expansion of the Chennai Metro.
| Operational Depots | |||
|---|---|---|---|
| Line name | Depot | Area (In Acres) | Cost |
| Green | Koyambedu | 64 | ₹198 crore (US$21 million) |
| Blue | Wimco Nagar | 8.64 | ₹230 crore (US$24 million) |
| Yellow | Poonamallee | 40.5 | ₹225 crore (US$23 million) |
| Under Construction | |||
| Line name | Depot | Area (In Acres) | Cost |
| Red | Madhavaram | 69 | ₹284.51 crore (US$30 million) |
| Purple | |||
| Purple | Semmancherry | 25 | TBC |
| Proposed | |||
| Red | Pattabiram | TBC | TBC |
As of 2022[update], the metro operates trains from 5:00 am to 11:00 pm. The blue line has an average frequency of every 6 minutes during peak hours and every 12 minutes during off-peak hours. On the green line, the average frequency is 12 minutes during peak hours and 18 minutes during off-peak hours. The main operational control center (OCC) is located in Koyambedu where the movement of trains and real-time CCTV footage obtained is monitored. In 2022-23, the average daily ridership was 0.25 million.

The minimum fare is ₹10 and the maximum fare is ₹50.
There are six types of tickets issued by CMRL for travel in Chennai Metro.
This was appreciated by the Planning Commission way back in 1965, when it took the initiative to set up Metropolitan Transport Teams (MTT) to study the transport problems of the first four metropolitan cities of Bombay, Calcutta, Delhi and Madras and to recommend policies and programs for their improvement.