| Devon Metro | |||
|---|---|---|---|
Okehampton Station was reopened in 2021 as part of the Devon Metro project | |||
| Overview | |||
| Area served | Greater Exeter (Exeter travel to work area) | ||
| Locale | Devon, United Kingdom | ||
| Transit type | Suburban rail, commuter rail | ||
Number of lines | 5 | ||
Number of stations | 41 | ||
Daily ridership | |||
| Operation | |||
| Operators | Great Western Railway, South Western Railway | ||
Infrastructure manager | Network Rail | ||
| Train length | 2–6 cars | ||
| Technical | |||
| System length | 112.5 miles (181.1 km) | ||
| Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | ||
| |||
The Devon Metro is a Devon County Council strategy to increase passenger rail usage and reduce overcrowding on the regional rail network in and around the city of Exeter in Devon. It includes five lines with a total of 41 stations.
The strategy was initiated in 2011. It has resulted in increasing the frequency of trains on existing lines, new lines and stations opening, and improved integration between trains and other modes of transport. The intention is to see a portion of the regional rail network become a "turn-up-and-go" service without the need to refer to a timetable
Due to the historical development of railways by competing companies in Exeter, which acts as the gateway to the rest of the South West Peninsula, the city has enjoyed an unusually extensive railway network for its size, being the meeting point of various lines. Despite substantial sections of Exeter's railway infrastructure being selected for closure as a part of the Beeching Axe, such as St Thomas station and the Avocet and East Devon Lines, most of the network survived, but underwent significant economies to justify their retention, including the singling of previously double-tracked routes.
In the years since, Exeter has gone through substantial expansion and has become one of the fastest-growing cities in the country, with growth particularly in the eastern suburbs of the city. This has led to Exeter becoming one of the most congested cities in the UK. The need to reduce congestion on the roads led to the reopening of Pinhoe and Digby & Sowton stations in 1983 and 1995 respectively, and the construction of a new passing loop at Axminster in 2009 to increase the frequency on the East Devon Line. These enhancements in the east of the city were intended to attract more commuters to travel to and from the city centre by train instead of car. The local rail routes subsequently experienced rapid growth in passenger numbers, forcing them to operate near or at maximum track capacity with the limitations of the single-track lines left after Beeching. This impacted reliability, due to the lack of leeway available if a train was slightly delayed. This caused problems to cascade, often requiring trains to be cancelled to regulate the service. Compounded with the continuing high levels of congestion and population growth, this led Devon County Council to submit an expression of interest to the government for funding towards what it dubbed the "Devon Metro scheme" in 2010.
Initial proposals of the Devon Metro scheme were laid out as part of the Future of Transport in Exeter consultation in March and April 2010. This set out short to medium term plans for new stations "related to areas of new development or existing employment sites in the city". New stations at Marsh Barton, Newcourt and Monkerton were explicitly mentioned. The proposal also included longer term goals such as a new station at Cullompton and increased train frequencies; however it also mentioned that increased train frequency would depend on the construction of new passing loops on single track lines.
In the final report written at the conclusion of the consultation, 84% of respondents indicated support for the rail enhancements under the Devon Metro scheme, with only 5% expressing opposition.
A further briefing was published in 2011 outlining the scheme in more detail, including an implementation plan for 2011-2026. In the short term they included:
The briefing also included longer term plans, including:
Several improvements were also ruled out at this stage:
Some of the enhancements completed since Devon Metro started:
Plans to create a Devon Metro also include a proposed new station at Edginswell on the Riviera Line. The council also wishes for the Dartmoor Line to be extended to serve the town of Tavistock, which would revive a connection provided until 1968 by the Exeter to Plymouth railway of the LSWR. A Tavistock rail link to Bere Alston was funded by the Restoring Your Railway fund until that was scrapped by the incoming Labour government in 2024.
Funding for stations in Wellington and Cullompton on the Bristol–Exeter line, which line was included in the Devon Metro plan but is yet to receive service enhancements, has been secured by new Spending Review settlement funding. Work on the new Wellington station commenced in early 2026.
2024/25 data shows that journeys to/from Exeter Central constitute the largest passenger flow for Newton Abbot (72,706 journeys), Exmouth (182,175 journeys), and Paignton (52,399 journeys).
The network has five operational lines with a total of 41 stations across Exeter, East Devon, Mid Devon and Teignbridge. All routes serve the two principal stations in Exeter, Exeter Central and Exeter St Davids.