The E7 series has operated since 15 March 2014 on the Hokuriku Shinkansen. It also operates on the Jōetsu Shinkansen following the March 2019 timetable revision. 47 sets have been built, of which 39 are in service as of March2024[update].
The W7 series has operated on the Hokuriku Shinkansen since it was extended from Nagano to Kanazawa in March 2015. The first W7 series train was delivered in April 2014. 24 sets have been built, of which 22 are in service as of March2024[update].
Design
Based on the earlier E2 series trains, the E7 and W7 series trains are designed with a "Japanese" theme inside and out, combining futuristic styling with traditional design elements overseen by industrial designer Ken Okuyama together with Kawasaki Heavy Industries. Externally, the roof is finished in a "sky blue" color, and the body sides are "ivory white" with "copper" and "sky blue" lining. The body side logos consist of a number "7" in silver stylized as an arrowhead, and include the lettering "East Japan Railway Company" or "West Japan Railway Company".
The trains have a maximum design speed of 275km/h (170mph), achieving it between Omiya and Takasaki, and operate at a maximum speed of 260km/h (160mph) on the rest of the Hokuriku Shinkansen, and at 110km/h (70mph) on the Tohoku Shinkansen tracks between Tokyo and Omiya. Increased power output enables the trains to maintain speeds of at least 210km/h (130mph) on the steep gradients of the Hokuriku Shinkansen.
Car 12 (Gran Class) is equipped with full active suspension, and the other cars are equipped with semi-active suspension.
Tanigawa (Tokyo - Echigo-Yuzawa), since 3 March 2019 (mainly E7, but W7 also operates a few services between Tokyo and Takasaki)
The trains entered regular passenger service from the start of the revised JR East timetable on 15 March 2014, with three trainsets introduced on Asama services on the Hokuriku Shinkansen (then still called the Nagano Shinkansen) between Tokyo and Nagano. Initially, E7 series trainsets operated seven return Asama services daily, with a further four return workings added from 19 April 2014.
Since 14 March 2015, with the opening of the Hokuriku Shinkansen extension from Nagano to Kanazawa, E7 series trainsets are also used on Hakutaka, Kagayaki, and Tsurugi services alongside the similar design JR West W7 series trains.
Interior
The 12-car trains have accommodation in three levels of service: Gran Class, Green car, and ordinary-class cars, with a total seating capacity of 934. Gran Class seating (car 12) is arranged 2+1 abreast with a seat pitch of 1,300mm (51in), Green car seating (car 11) is arranged 2+2 abreast with a seat pitch of 1,160mm (46in), and ordinary seating (cars 1 to 10) is arranged 3+2 abreast with a seat pitch of 1,040mm (41in). AC power outlets are provided for each seat in all three classes. The Gran class seats are supplied by Toyota Boshoku. Car saloons and vestibule areas are equipped with security cameras. Between October and December 2015, luggage racks are scheduled to be added at one end of each of the even-numbered ordinary class cars and also in Green car 11, by removing a pair of seats (1D and 1E). The luggage racks are to cater to the increased number of overseas tourists with suitcases and also passengers with ski and snowboard equipment in the winter season.
Gallery
Interior of Gran Class car E714-5 (car 12) in May 2022
Gran Class seating in May 2022
Interior of Green car E715-5 (car 11) in May 2022
Interior of ordinary-class car E725-409 (car 7) in February 2022
The toilet in ordinary car 7 in February 2022
The Multipurpose room in February 2022
Formations
The E7 series sets are numbered "F1" onward, and the W7 series sets are numbered "W1" onward. All sets consist of 10 motored intermediate cars with non-powered (trailer) end cars. Car 11 provides Green car (first class) accommodation, and car 12 provides Gran Class luxury accommodation. Sets are formed as shown below, with car 1 at the Tokyo end.
Car No.
1
2
3
4
5
6
7
8
9
10
11
12
Designation
Tc
M2
M1
M2
M1
M2
M1
M2
M1
M2
M1s
Tsc
Class
Ordinary
Green
Gran
Numbering (E7 series)
E723
E726‑100
E725
E726‑200
E725‑100
E726‑300
E725‑200
E726‑400
E725‑400
E726‑500
E715
E714
Numbering (W7 series)
W723‑100
W726‑100
W725‑100
W726‑200
W725‑200
W726‑300
W725‑300
W726‑400
W725‑400
W726‑500
W715‑500
W714‑500
Weight (t)
41.3
44.7
46.1
45.2
46.4
45.2
46.5
45.2
46.4
45.0
45.6
44.5
Capacity
50
100
85
100
85
90
58
100
85
100
63
18
Facilities
Toilet
Toilet
Toilet
Conductor's office
Toilet, wheelchair space
Toilet
Toilet, wheelchair space
Toilet
Cars 3 and 7 are each equipped with a single-arm pantograph.
Build histories
As of 1April2021[update], 47 E7 series sets and 24 W7 series sets have been built, with build details as follows. Eight E7 series sets and two W7 series sets were withdrawn in 2020 following flood damage sustained during Typhoon Hagibis.
E7 series fleet
Set
Manufacturer
Delivered
Withdrawn
F1
Kawasaki
27 November 2013
31 March 2020
F2
Hitachi
25 December 2013
31 March 2020
F3
Hitachi
30 January 2014
F4
Kawasaki
24 February 2014
F5
Kawasaki
18 March 2014
F6
Kawasaki
2 June 2014
F7
J-TREC
26 June 2014
5 March 2020
F8
J-TREC
14 July 2014
31 March 2020
F9
J-TREC
27 August 2014
F10
Hitachi
16 September 2014
14 January 2020
F11
J-TREC
6 October 2014
F12
J-TREC
10 November 2014
F13
Hitachi
19 December 2014
F14
Hitachi
19 January 2015
31 March 2020
F15
Kawasaki
6 February 2015
F16
Hitachi
8 April 2015
31 March 2020
F17
Kawasaki
6 March 2015
F18
J-TREC
26 October 2015
31 March 2020
F19
Kawasaki
3 April 2017
F20
Kawasaki
31 October 2018
F21
Hitachi
20 November 2018
F22
Kawasaki
5 December 2018
F23
Hitachi
8 September 2019
F24
Hitachi
8 September 2019
F25
Kawasaki
7 October 2019
F26
Hitachi
11 November 2019
F27
Hitachi
24 January 2020
F28
J-TREC
25 January 2022
F29
Kawasaki
9 November 2020
F30
Kawasaki
3 December 2020
F31
Hitachi
26 February 2021
F32
Kawasaki
11 May 2021
F33
Hitachi
17 August 2021
F34
Hitachi
6 October 2021
F35
J-TREC
9 November 2021
F36
Kawasaki
21 October 2021
F37
Hitachi
3 August 2022
F38
Kawasaki
6 December 2022
F39
Kawasaki
30 January 2023
F40
Hitachi
12 May 2021
F41
Hitachi
4 June 2021
F42
Kawasaki
7 June 2021
F43
J-TREC
2 August 2021
F44
Hitachi
14 January 2022
F45
Hitachi
21 November 2022
F46
Kawasaki
28 March 2023
F47
Hitachi
11 January 2023
W7 series fleet
Set
Manufacturer
Delivered
Withdrawn
W1
Kawasaki
30 April 2014
W2
Hitachi
5 June 2014
31 March 2020
W3
Kawasaki
30 June 2014
W4
Hitachi
18 July 2014
W5
Kawasaki
21 August 2014
W6
Kawasaki
11 September 2014
W7
Kinki Sharyo
27 September 2014
31 March 2020
W8
Hitachi
15 October 2014
W9
Hitachi
3 November 2014
W10
Kinki Sharyo
26 December 2014
W11
Hitachi
17 September 2015
W12
Hitachi
29 October 2021
W13
Hitachi
8 December 2021
W14
Hitachi
31 March 2022
W15
Hitachi
11 November 2023
W16
Hitachi
2 December 2023
W17
Kawasaki
31 May 2022
W18
Kawasaki
6 July 2022
W19
Kawasaki
5 July 2022
W20
Kawasaki
24 August 2022
W21
Kinki Sharyo
22 November 2022
W22
Kawasaki
28 October 2022
W23
Kinki Sharyo
18 October 2023
W24
Hitachi
6 December 2022
History
Cars of the first W7 series set, W1, being unloaded at Kanazawa Port in April 2014
In December 2011, the Mainichi Shimbun reported that JR East was considering developing new E7 series 10-car sets based on the existing E2 series design for use on Hokuriku Shinkansen services. In January 2012, the head of JR-West's Kanazawa Division revealed that new trains for the Hokuriku Shinkansen would be developed in conjunction with JR East, and that test running would need to be conducted during the winter season a year before the line opening to thoroughly test the ability of the trains to cope with snowy conditions. Details of the new trains were formally announced jointly by JR East and JR West on 4 September 2012.
The first E7 series train was delivered to Sendai Depot in November 2013, and shown off to the media on 28 November. Night-time testing commenced in December 2013 on the Nagano Shinkansen, with daytime test-running between Nagano and Tokyo starting on 8 January 2014. The design of the logo to be applied to the sides of cars 1 and 12 was officially unveiled in February 2014.
The first three trains, sets F1 to F3, entered regular passenger service from the start of the revised JR East timetable on 15 March 2014. The entire fleet of 17 sets, numbered F1 to F17, was delivered by the start of the 14 March 2015 timetable revision, although sets F16 and F17 did not enter revenue service until after this date.
The first W7 series train was delivered from Kawasaki Heavy Industries in Kobe to Hakusan Depot in Hakusan, Ishikawa in April 2014. Test-running on the Hokuriku Shinkansen began on 5 August 2014, initially at low speed, between Kanazawa and Jōetsumyōkō.
In April 2015, JR East announced that it was ordering an additional E7 series set to be introduced from autumn 2015, replacing the remaining E2 series trainsets used on regularly scheduled Hokuriku Shinkansen Asama services.
In May 2015, the W7 series and E7 series were awarded the 2015 Blue Ribbon Award, presented annually by the Japan Railfan Club. A presentation ceremony was held at JR West's Hakusan Depot on 24 October 2015.
On 12 October 2019, eight E7 series and two W7 series trains were damaged due to floodwaters from Typhoon Hagibis while they were stored at JR East Nagano Shinkansen Vehicle center. The sets were scrapped shortly thereafter.
In November 2021, JR East demonstrated autonomous operation with an E7 set in Niigata prefecture traveling 5 kilometres (3.1mi) between Niigata Station and Niigata Shinkansen Rolling Stock Center. They started testing on 29 October.
From the start of the revised timetable on 18 March 2023, all train services on the Joetsu Shinkansen will be operated solely by E7 series sets as the line undergoes an operating speed increase from 240 to 275km/h (150 to 170mph). The trains will replace the older E2 series sets in the process.
123 3月15日ダイヤ改正と各地の話題 [15 March timetable revision and topics from around the regions]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol.43, no.361. Japan: Kōtsū Shimbun. May 2014. p.12.
1234"E7系・W7系新幹線電車" [E7/W7 series shinkansen EMU]. Japan Railfan Magazine. Vol.52, no.619. Japan: Koyusha Co., Ltd. November 2012. pp.48–49.
12W7系、30日に石川初走行 白山車両所[W7 runs for first time inside Hakusan Depot]. The Hokkoku Shimbun (in Japanese). Japan. 24 April 2014. Archived from the original on 30 August 2014. Retrieved 27 May 2014.
↑北陸路走る 伝統と未来 新幹線デザイン決定[Hokuriku Shinkansen design announced - tradition and future]. Chunichi Web (in Japanese). Japan: The Chunichi Shimbun. 5 September 2012. Retrieved 18 September 2012.{{cite web}}: CS1 maint: deprecated archival service (link)
123北陸新幹線用の新型車両について[New trains for Hokuriku Shinkansen](PDF). Press release (in Japanese). Japan: JR East & JR West. 4 September 2012. Archived(PDF) from the original on 24 February 2021. Retrieved 4 September 2012.
12北陸新幹線用新型車両シンボルマークデザイン決定[Logo design finalized for new Hokuriku Shinkansen trains](PDF). News release (in Japanese). Japan: East Japan Railway Company & West Japan Railway Company. 13 February 2014. Archived(PDF) from the original on 3 September 2014. Retrieved 13 February 2014.
↑総合車両製作所、北陸新幹線の車両生産工場増強-60両5編成受注[J-TREC expands its rolling stock manufacturing facilities for Hokuriku Shinkansen trains, with order for 60 vehicles]. Nikkan Kogyo Shimbun Business Line (in Japanese). Japan: The Nikkan Kogyo Shimbun Ltd. 26 June 2013. Archived from the original on 3 July 2013. Retrieved 3 July 2013.
1234567"E7系新幹線電車" [E7 series shinkansen EMU]. Japan Railfan Magazine (in Japanese). Vol.54, no.634. Japan: Koyusha Co., Ltd. February 2014. pp.9–13.
↑Saito, Masatoshi (4 September 2012). JR東:北陸新幹線の新型車両「E7系」概要発表[JR East announces details of new E7 series for Hokuriku Shinkansen]. Mainichi jp (in Japanese). Japan: The Mainichi Newspapers. Retrieved 4 September 2012.[dead link]
↑"E7系による"とき"運転開始"[E7 series begins "Toki" operations]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 16 March 2019. Archived from the original on 20 April 2021. Retrieved 19 May 2022.
↑北陸新幹線 長野~金沢間開業に伴う運行計画の概要について[Outline of service plans for opening of Hokuriku Shinkansen from Nagano to Kanazawa](PDF). News release (in Japanese). Japan: JR East & JR West. 27 August 2014. Archived(PDF) from the original on 22 July 2014. Retrieved 27 August 2014.
↑トヨタ紡織、鉄道車両用シートを初受注 ~ 北陸新幹線「グランクラス」に採用 ~[Toyota Boshoku wins first order for train seats - to be used on Hokuriku Shinkansen "Gran Class"]. News Release (in Japanese). Japan: Toyota Boshuku Corporation. 16 April 2013. Archived from the original on 3 March 2016. Retrieved 18 April 2013.
↑北陸新幹線E7系・W7系への荷物置場の設置について[Installation of luggage racks on Hokuriku Shinkansen E7/W7 series trains]. News release (in Japanese). Japan: West Japan Railway Company. 3 September 2015. Archived from the original on 30 July 2020. Retrieved 3 September 2015.
12"W7系新幹線電車" [W7 series shinkansen EMU]. Japan Railfan Magazine (in Japanese). Vol.54, no.638. Japan: Koyusha Co., Ltd. June 2014. p.67.
12"E7系・W7系新幹線電車" [E7/W7 series shinkansen EMU]. Japan Railfan Magazine (in Japanese). Vol.54, no.635. Japan: Koyusha Co., Ltd. March 2014. pp.57–64.
↑ JR電車編成表 2017冬 [JR EMU Formations - Winter 2017] (in Japanese). Japan: Kotsu Shimbunsha. 16 November 2016. p.134. ISBN978-4-330-73716-4.
↑ JR電車編成表 2017夏 [JR EMU Formations - Summer 2017] (in Japanese). Japan: Kotsu Shimbunsha. 18 May 2017. ISBN978-4-330-78717-6.
12345678JR旅客会社の車両配置表2014/JR車両のデータバンク2013-2014 [JR Passenger Company's Vehicle Layout 2014/JR Vehicle Data Bank 2013-2014]. Japan Railfan Magazine (in Japanese). Vol. 54, no. 639. Japan: Koyusha Co., Ltd. July 2014. p. 38.
123456789101112131415161718JR旅客会社の車両配置表2015/JR車両のデータバンク2014-2015 [JR Passenger Company's Vehicle Layout 2015/JR Vehicle Data Bank 2014-2015]. Japan Railfan Magazine (in Japanese). Vol. 55, no. 651. Japan: Koyusha Co., Ltd. July 2015. p. 36-37,46.
123JR旅客会社の車両配置表2016/JR車両のデータバンク2015-2016 [JR Passenger Company's Vehicle Layout 2016/JR Vehicle Data Bank 2015-2016]. Japan Railfan Magazine (in Japanese). Vol. 56, no. 663. Japan: Koyusha Co., Ltd. July 2016. p. 38,45.
↑JR旅客会社の車両配置表2018/JR車両のデータバンク2017-2018 [JR Passenger Company's Vehicle Layout 2018/JR Vehicle Data Bank 2017-2018]. Japan Railfan Magazine (in Japanese). Vol. 58, no. 687. Japan: Koyusha Co., Ltd. July 2018. p. 35
123JR旅客会社の車両配置表2019/JR車両のデータバンク2018-2019 [JR Passenger Company's Vehicle Layout 2019/JR Vehicle Data Bank 2018-2019]. Japan Railfan Magazine (in Japanese). Vol. 59, no. 699. Japan: Koyusha Co., Ltd. July 2019. p. 34-35
12345JR旅客会社の車両配置表2020/JR車両のデータバンク2019-2020 [JR Passenger Company's Vehicle Layout 2020/JR Vehicle Data Bank 2019-2020]. Japan Railfan Magazine (in Japanese). Vol. 60, no. 711. Japan: Koyusha Co., Ltd. July 2020. p. 32-39.
1234567891011121314JR旅客会社の車両配置表2022/JR車両のデータバンク2021-2022 [JR Passenger Company's Vehicle Layout 2021/JR Vehicle Data Bank 2021-2022]. Japan Railfan Magazine (in Japanese). Vol. 62, no. 735. Japan: Koyusha Co., Ltd. July 2022. p. 32-40.
123JR旅客会社の車両配置表2021/JR車両のデータバンク2020-2021 [JR Passenger Company's Vehicle Layout 2021/JR Vehicle Data Bank 2020-2021]. Japan Railfan Magazine (in Japanese). Vol. 61, no. 732. Japan: Koyusha Co., Ltd. July 2015. p. 32-40.
↑Saito, Masatoshi (13 December 2011). 北陸新幹線:山越え時速200キロ、パワフル「E7系」金沢へ 延伸でJR東日本開発[JR East to develop powerful E7 series to maintain 200km/h through mountains to Kanazawa on Hokuriku Shinkansen]. Mainichi jp (in Japanese). Japan: The Mainichi Newspapers. Archived from the original on 31 December 2013. Retrieved 31 December 2013.
↑「大幅変更なし」 七尾線など、新幹線開業後も["No major changes" to Nanao Line and others even after shinkansen route opens]. Ishikawa News (in Japanese). Japan: The Hokkoku Shimbun. 28 January 2012. Archived from the original on 18 June 2013. Retrieved 4 September 2012.
↑流線型に銅色ライン…北陸新幹線「E7系」公開[Streamlined form with copper lining - Hokuriku Shinkansen "E7 series" unveiled]. Yomiuri Online (in Japanese). Japan: The Yomiuri Shimbun. 28 November 2013. Retrieved 11 January 2014.{{cite web}}: CS1 maint: deprecated archival service (link)
↑E7系、昼の信濃路を疾走 長野-東京間試験走行[E7 series starts daytime test-running between Nagano and Tokyo]. Shinmai Web (in Japanese). Japan: The Shinano Mainichi Shimbun. 9 January 2014. Archived from the original on 9 January 2014. Retrieved 11 January 2014.
12 平成27年3月14日ダイヤ改正にともなうJR東日本車両の動き [Rolling stock changes connected with the 14 March 2015 timetable revision]. Japan Railfan Magazine (in Japanese). Vol.55, no.649. Japan: Koyusha Co., Ltd. May 2015. p.68.
↑"北陸新幹線金沢~上越妙高間でW7系による走行試験が始まる"[Test-running using W7 series begins on Hokuriku Shinkansen between Kanazawa and Jōetsumyōkō]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 5 August 2014. Archived from the original on 7 August 2017. Retrieved 5 August 2014.
↑JR西 130億円増収効果 16年3月期予想 秋以降に車両追加[JR West forecasts profits of 13 billion yen for March 2016 - Additional train from autumn]. Chunichi Web (in Japanese). Japan: The Chunichi Shimbun. 1 May 2015. Archived from the original on 18 May 2015. Retrieved 14 September 2016.
↑ブルーリボン賞・ローレル賞 選定車両一覧[Blue Ribbon Award & Laurel Prize Winner List] (in Japanese). Japan: Japan Railfan Club. 21 May 2015. Archived from the original on 26 October 2010. Retrieved 21 May 2015.
↑ E7系・W7系 ブルーリボン賞を受賞 [E7 and W7 series receive Blue Ribbon Award]. Japan Railfan Magazine (in Japanese). Vol.56, no.658. Japan: Koyusha Co., Ltd. February 2016. p.67.
↑"JR東日本,3月18日にダイヤ改正を実施"[JR East Implements Schedule Revision Effective 18 March 2023]. Japan Railfan Magazine Online (in Japanese). 16 December 2022. Archived from the original on 19 December 2022. Retrieved 19 December 2022.