Line D (Lyon Metro)

Line D
Overview
Native nameLigne D
Termini
  • Gare de Vaise
  • Gare de Vénissieux
Connecting lines (Lyon Metro)Line A (Lyon Metro)Line B (Lyon Metro)
Funiculars of LyonFuniculars of LyonFuniculars of Lyon
Lyon tramwayLyon tramway#Line T1Lyon tramway#Line T2Lyon tramway#Line T4Lyon tramway#Line T5Lyon tramway#Line T6
Stations15
Service
TypeRapid transit
SystemLyon Metro
OperatorTCL
Rolling stock
MPL 85
RidershipAnnual: 84,201,000 (2019)
History
Opened9 September 1991
Last extension28 April 1997
Technical
Line length12.5 km (7.8 mi)
CharacterDriverless (MAGGALY)
Rack systemNone
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge with rollways outside of track
Electrification750 V DC third rail (guide bars)
Average inter-station distance
929 m (3,048 ft)

Line D (Ligne D) is a rapid-transit line on the Lyon Metro. It runs east–west underneath the two major rivers of Lyon, France, connecting Vieux Lyon with the Presqu'ile and the Part-Dieu region. Line D commenced operation under human control on 4 September 1991, between Gorge de Loup and Grange Blanche. It was extended from Grange Blanche to Gare de Vénissieux on 11 December 1992, when it switched to automatic (driverless) operation, also known as MAGGALY (Métro Automatique à Grand Gabarit de l’Agglomération Lyonnaise). On 28 April 1997, the line was extended from Gorge de Loup to Gare de Vaise.

Being the deepest of the lines in Lyon, it was constructed mainly using boring machines and passes under both rivers, the Rhône and the Saône. At 12.5 kilometres (7.8 mi) long and serving 15 stations, it is also the longest metro line in Lyon.

List of the stations

Metro D entering in the station Guillotière–Gabriel Péri.
Map of the line

Chronology

Rolling stock

Since the opening of the line in 1991, there are 36 MPL 85 trains. The MPL 85 are composed of 2 cars per trainset.

From 2020, only during peak hours, each train could combine two MPL 85 trainsets and form a single train of 4 cars.[citation needed]

In 2016, new MPL 16 trains have been ordered to Alstom. 18 of them will circulate on the line starting from 2027, in addition to MPL 85 trains. The 2 cars of each train will be connected with gangways, which is a novelty in Lyon Metro rolling stock.[citation needed]

The MPL 16 trains won't be able to run on the line D with the current driverless system, MAGGALY. To overcome this problem, the line D will get a new driverless system, the same as the one equipping line B since 2022, where MPL 16 circulate too.[citation needed]