Mount Millar Wind Farm

Mount Millar Wind Farm
Mount Millar wind farm at sunset
CountryAustralia
LocationEyre Peninsula, South Australia
Coordinates33°37′28″S 136°42′13″E / 33.624526°S 136.703690°E / -33.624526; 136.703690
StatusOperational
Construction began2004
Commission date28 February 2006
Construction costA$130M
OwnerMeridian Energy
Wind farm
TypeOnshore
Hub height85 metres (279 ft)
Rotor diameter70 metres (230 ft)
Power generation
Units operational35
Make and modelEnercon E70
Nameplate capacity70 MW
External links
Websitewww.meridianenergy.co.nz
CommonsRelated media on Commons

The Mount Millar Wind Farm on the Eyre Peninsula in South Australia.

The Mount Millar Wind Farm was the first wind farm in South Australia to use direct drive turbines that don't have gear boxes. It is connected to aElectraNet transmission network at Yadnarie Substation.

Construction of this wind farm started in late 2004 and was completed in December 2005. Power production started in February 2006. The $130 million project was developed by Tarong Energy and in 2007 sold to Transfield Services. In 2010 it was purchased by Meridian Energy.