Paris Metro Line 15 is one of the four new lines of Grand Paris Express, a major expansion project of the Paris Metro throughout Ile-de-France region. Currently under construction, the line will provide a new orbital route through the suburbs of Paris, servicing the departments of Hauts-de-Seine, Val-de-Marne and Seine-Saint-Denis and allowing people to commute from suburbs to suburbs without necessarily entering Paris. The southern section of the line is planned to open in autumn 2027, with the completed line currently planned to open in 2031.
In line with all Grand Paris Express lines, Line 15 will be fully automated from day one. Upon completion, Line 15 will be one of the world's longest underground rapid transit train tunnels fully dedicated to passenger service, and also become the longest driverless metro line in the world.
Line 15 is built by the Société des Grands Projets (SGP), a public agency formerly known as the Société du Grand Paris, until its rebranding in late 2023 to reflect an expanded scope in national infrastructure projects.
Line 15's route bears a strong resemblance to the Arc Express proposal initially presented by RATP in 2006. It was subsequently incorporated as the "Red Line" within the Grand Paris public transportation network project, introduced by then-President Nicolas Sarkozy in 2009. The line received its current designation in 2013 when Prime Minister Jean-Marc Ayrault announced the "New Grand Paris" project.
The initial 2013 government plan announced groundbreaking for the southern section in early 2015, groundbreaking for the western and eastern segments in 2020, opening of the southern section in 2024 (later revised to 2025, then to summer 2026, then to late 2026, then to April 2027, now to Autumn 2027) and completion of the western and eastern sections in 2030 (later revised to 2031). Delays to the opening of the southern section announced since 2024 have been attributed to problems during testing the line's day-to-day operation. These delays affect the opening of lines 16 and 17 despite both being physically disconnected from the southern section of Line 15.
Following mid-2026 adjustments, the SGP rescheduled Line 15 South's opening to autumn 2027, preceded by the first phase of Line 18 (connecting Massy–Palaiseau to CEA Saint-Aubin) in December 2026. This sequencing establishes Line 18 as the first brand new line of the Grand Paris Express network to enter public service, despite having the highest number.
Line 15 is constructed in two phases :
![]()
The southern section (Pont de Sèvres to Noisy–Champs) encompasses 16 stations, two maintenance depots and stretches 33 kilometres (21 mi). The construction of this section has encountered delays, missing the targeted opening before the 2024 Summer Olympics. This section of the line is estimated to have cost around €3.7 billion.
A significant engineering milestone was the completion of the Villejuif–Gustave Roussy station. While the station's upper levels began serving the Line 14 extension in 2024, its Line 15 platforms are located at a depth of -48.8 meters (level -9). It is the second-deepest station on the network, surpassed only by Saint-Maur–Créteil, and was designed as a vertical 'open cylinder' to allow natural light to reach the lower mezzanine levels.
| Station | Image | Commune | Opening | Interchanges | Distance (in km) | |
|---|---|---|---|---|---|---|
| Noisy–Champs Champy–Nesles |
Noisy-le-Grand, Champs-sur-Marne | Autumn 2027 | – | 0.0 | ||
| Villiers–Champigny–Bry | Villiers-sur-Marne, Champigny-sur-Marne | Autumn 2027 | 5.4 | 5.4 | ||
| Champigny Centre | Champigny-sur-Marne | Autumn 2027 | 2.1 | 7.5 | ||
| Saint-Maur–Créteil | Saint-Maur-des-Fossés | Autumn 2027 | 3.2 | 10.7 | ||
| Créteil–L'Échat Hôpital Henri Mondor |
Créteil | Autumn 2027 | 2.4 | 13.1 | ||
| Le Vert de Maisons | Maisons-Alfort, Alfortville | Autumn 2027 | 1.5 | 14.6 | ||
| Les Ardoines | Vitry-sur-Seine | Autumn 2027 | 1.9 | 16.5 | ||
| Mairie de Vitry-sur-Seine | Vitry-sur-Seine | Autumn 2027 | 2.0 | 18.5 | ||
| Villejuif–Louis Aragon | Villejuif | Autumn 2027 | 1.5 | 20.0 | ||
| Villejuif–Gustave Roussy | Villejuif | Autumn 2027 | 1.6 | 21.6 | ||
| Arcueil–Cachan | Arcueil, Cachan | Autumn 2027 | 1.7 | 23.3 | ||
| Bagneux–Lucie Aubrac | Bagneux | Autumn 2027 | 0.9 | 24.2 | ||
| Châtillon–Montrouge | Châtillon, Montrouge | Autumn 2027 | 1.6 | 25.8 | ||
| Clamart | Clamart, Issy-les-Moulineaux, Vanves, Malakoff | Autumn 2027 | 2.0 | 27.8 | ||
| Issy | Issy-les-Moulineaux | Autumn 2027 | 1.5 | 29.3 | ||
| Pont de Sèvres | Boulogne-Billancourt | Autumn 2027 | 2.5 | 31.8 | ||

The northern section comprises two segments: west (Pont de Sèvres to Saint-Denis–Pleyel) and east (Saint-Denis–Pleyel to Champigny Centre). Upon completion, now scheduled for 2031, these sections will connect with the southern section to form the complete orbital route. This leg of the project will encompass 16 stations and a maintenance depot. The eastern section's initial cost estimate of €3.77 billion has been revised upwards to €5.65 billion (as of 2021[update]).
While major construction contracts for the line itself haven't been awarded yet, preparatory work is underway at Saint-Denis–Pleyel and Champigny Centre stations, which are being built for other lines but will include platforms for Line 15.
In July 2018, Alstom secured a €1.3 billion contract to supply 183 Alstom Metropolis trains for the Grand Paris Express project, with the initial 162 cars (27 six-car Alstom Metropolis MR6V trains) designated for Line 15 to be delivered from 2022 onwards.
Train Specifications
In July 2023, the operation and maintenance contract for Line 15 South was awarded to the ORA Consortium, led by RATP Dev in partnership with Alstom and ComfortDelGro. As of April 2026, the consortium has entered the final dynamic testing phase for the automated Metropolis MR6V trains, focusing on system integration and station readiness along the 33-kilometer southern segment.