Pink Line (Pune Metro)

Pink Line (Line 3)
A Pink Line driverless Alstom Metropolis rake at Hinjawadi Phase-I, captured during testing.
Overview
OwnerPune Metropolitan Region Development Authority (PMRDA)
Line number3
LocalePune Metropolitan Region
Termini
Stations19
4 under construction
Website
Service
TypeRapid Transit
SystemPune Metro
OperatorKeolis (under concession from Pune IT City Metro Rail Ltd.)
Depot(s)Maan, Hinjawadi
Rolling stock
Alstom Metropolis
History
Opened4 November 2026; 27 days ago (2026-11-04)
Technical
Line length23.3 km (14.5 mi)
Num of tracks2
CharacterGrade separated, Elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750V DC Third rail
Operating speed
85 km/h (53 mph)
SignallingCBTC
Route map

Legend
Hinjawadi Depot
Maan
Maan - MIDC Circle Phase-II
Maan Bus Depot
Hinjawadi Phase-II Circle-II
Hinjawadi Phase-II Circle-I
Padmabhushan Chowk
Shree Shiv Chhatrapati Shivaji Maharaj Chowk Hinjawadi
Hinjawadi Phase-I
Wakad Chowk
Shree Shiv Chhatrapati Sports Complex Mahalunge
Mitcon Balewadi
R K Laxman Museum Balewadi
Balewadi High Street
Balewadi Phata
Baner Gaon
Baner Pashan Link Road
Aundh
Sakal Nagar
Savitribai Phule Pune University
Bhosalenagar - RBI
Agriculture College
Shivaji Nagar Bus interchangeMainline rail interchange
District Court Pune

The Pink Line (Line 3) of the Pune Metro is the third line of the city of Pune's under-construction mass transit network. It runs from District Court, Pune to Megapolis Pune in Hinjawadi. The 23.3 km (14.5 mi) line is completely elevated and finally has 23 stations and aligns with the Maharashtra Metro Rail Corporation Limited (Maha Metro) lines at the District Court metro station . The construction was be taken up in two phases, the section between Hinjawadi and Balewadi was expected to be taken up first, followed by the section between Balewadi and District Court, Shivajinagar. In the end, the whole line was inaugurated by Prime Minister Modi on 3 November 2026 with commercial start the following day, but 4 stations are still under construction and will be open until 2027.

A metro car shed was built in Hinjawadi. The MIDC provided 55 acres (22 ha) of land in Hinjawadi for setting up a Metro rail depot. On 3 August 2018, Pune Metropolitan Region Development Authority (PMRDA) announced the final bidder for the project — the joint venture Tata Realty-Siemens. Pune IT City Metro Rail Limited On 3 October 2018, Tata Realty-Siemens were awarded the contract to execute the project on a design, build, finance, operate and transfer model. The formal concession agreement was signed in September 2019 with the construction expected to begin in March 2020. The line was inaugurated on 3 November 2026, with passenger service to start on 4 November.

Route

Pink Line runs from Megapolis Pune in Hinjawadi to District Court, Pune. The 23.3 km (14.5 mi) line is completely elevated and will have 23 stations after full completion. It aligns with the Maharashtra Metro Rail Corporation Limited (Maha Metro) lines at the District Court interchange station. Depot is located at behind the Northeats terminus in Maan village. It spreads across 20 hectares (49 acres).

Interactive map of Pune Metro Pink Line

Opening

The Pink Line's opening was met with a series of constructional and technical issues with the line being delayed multiple times before the virtual inauguration on 3 November and commercial start the next day, while still four stations remain closed due to constructional delays.

List of stations

Following is a list of stations on this route:

Pink Line
# Station Name Opening Connections
English Marathi
1 Maan माण 4 November 2026
2 Maan - MIDC Circle Phase-II माण - एमआयडीसी सर्कल फेज-II
3 Maan Bus Depot माण बस डेपो
4 Hinjawadi Phase-II Circle-II हिंजवडी फेज-II सर्कल-II
5 Hinjawadi Phase-II Circle-I हिंजवडी फेज-II सर्कल-I
6 Padmabhushan Chowk पद्मभूषण चौक
7 Shree Shiv Chhatrapati Shivaji Maharaj Chowk Hinjawadi श्री शिवछत्रपती शिवाजी महाराज चौक हिंजवडी
8 Hinjawadi Phase-I हिंजवडी फेज-I
9 Wakad Chowk वाकड चौक
10 Shree Shiv Chhatrapati Sports Complex Mahalunge श्री शिवछत्रपती क्रीडा संकुल महाळुंगे
11 Mitcon Balewadi मिटकॉन बालेवाडी
12 R K Laxman Museum Balewadi आर.के. लक्ष्मण संग्रहालय बालेवाडी
13 Balewadi High Street बालेवाडी हाय स्ट्रीट 25 November 2026
14 Balewadi Phata बालेवाडी फाटा
15 Baner Gaon बाणेर गाव Dec 2026
16 Baner Pashan Link Road बाणेर पाषाण जोडरस्ता
17 Aundh औंध 4 November 2026
18 Sakal Nagar सकाळ नगर
19 Savitribai Phule Pune University सावित्रीबाई फुले पुणे विद्यापीठ
20 Bhosalenagar - RBI भोसलेनगर - आरबीआय 2027
21 Agriculture College कृषी महाविद्यालय 4 November 2026
22 Shivaji Nagar शिवाजी नगर Dec 2026 Purple Line
23 District Court Pune जिल्हा न्यायालय पुणे 4 November 2026 Purple Line
Aqua Line

Construction

The contract for conducting geotechnical investigation was awarded to Soiltech India Private Limited. Geotechnical investigation commenced on 19 June 2019. However, due to the COVID-19 pandemic and the subsequent nationwide lockdown, work on several projects had been delayed, including Pink Line. Following a gap of nearly 11 months, piling works resumed at multiple locations near Hinjawadi in May 2020.

Pune Metro Line 3 has achieved a significant milestone with the Commissioner of Metro Rail Safety (CMRS) for the commencement of passenger operations on the first phase of the project, covering the 12-station section between Maan Metro Station and R.K. Laxman Museum (Balewadi) Metro Station. The approval follows the successful completion of all statutory inspections, safety validations, confirmatory trial runs and mandatory compliance requirements, paving the way for the commencement of commercial passenger services on the first stretch of the corridor. The 23.3-kilometre (14.5 mi) metro line connecting Hinjawadi IT Park with Shivajinagar will be operationalised in two phases, with the Maan–R.K. Laxman Museum section opening first, followed by the remaining stretch up to Shivajinagar.

Pune Metro Line 3 receives CMRS approval for Phase 1 operations of the 23.3 km (14.5 mi) stretch. The total project cost for the line was ₹8,313 crore (US$890 million).

Extension

PMRDA proposed an extension of Pink Line from District Court station towards Hadapsar. In-principle approval for DPR was given by the then CM and PMRDA head Devendra Fadnavis in December 2018. DPR for extension is being prepared by Delhi Metro Rail Corporation under supervision of PMRDA. As per draft DPR submitted by PMRDA, proposed stations for extension will be Railway Colony, Collector's Office, MG Road, Fashion Street, Mhammadevi Chowk, Race Course, Kaluba Chowk, Vaiduwadi, Hadapsar Phata, Hadapsar Gadital bus stand, Civil Aviation Ground, Phursungi IT Park and Sulabh Garden.

In December 2020, DMRC announced bid to conduct geotechnical investigation works for DPR preparation for Hadapsar-Loni Kalbhor extension. The second extension is expected to increase line 3's length by 8.5 km (5.3 mi) with 4-5 new stations at various locations.