Gaziray

Gaziray
A train of E39000 [tr] cars at Başpınar station [tr] in October 2026
Overview
StatusOperating
OwnerTurkish State Railways
LocaleGaziantep, Turkey
Termini
Stations17
Service
TypeCommuter rail
Services2
Başpınar – Taşlıca
Taşlıca – Başpınar
Operator(s)TCDD Taşımacılık and GAZİULAŞ
DepotTaşlıca
History
OpenedNovember 5, 2022
Technical
Line length25 km (16 mi)
Num of tracks3
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV, 50 Hz AC overhead line
Operating speed
120 km/h (75 mph) (Max)
Route map

Distance
Station
Narlı-Karkamış railway
to Narlı
Nurdağı-Başpınar railway
to Nurdağı
0
Başpınar
0.8
OSB-3
1.8
OSB-4
4.2
Dülük
7.4
Stadyum
8.3
Beylerbeyi
9.2
Fıstıklık
10.9
Selimiye
12.8
Adliye
14.5
Topraklık
15.3
Mücahitler
16.4
Gar
18.4
Göllüce
20.5
Seyrantepe
21.3
Mustafa Yavuz
23.6
Taşlıca
Taşlıca yard
Narlı-Karkamış railway
to Karkamış

Gaziray is a commuter rail line serving Gaziantep, Turkey. Being 25 kilometres (16 mi) long, the line is the fourth commuter rail system in the country, after İZBAN, Marmaray, and Başkentray. The system is also a part of major upgrades along the Mersin-Adana-Osmaniye-Gaziantep railway corridor.

Background

Gaziray is a joint venture between the Turkish State Railways and the Gaziantep Metropolitan Municipality to expand the existing right-of-way from a single-track route to a triple-track route, with segregated train traffic, as well as constructing new stations and renovating existing ones. A new 4.8 km (3.0 mi) tunnel, located west of Gaziantep station, is also included within the project. Construction began in March 2016 and was expected to be completed towards the end of 2018, however as of June 2019 the project is 85% complete. Test running on the line started in September 2022. The line started operating on November 5, 2022.

Similar to many other rail-transport systems in Turkey, the name Gaziray is a portmanteau of Gazi from Gaziantep and ray, which is the Turkish word for rail.

Stations

There are a total of sixteen stations on the 25.532 km (15.865 mi) long Gaziray line, two of which are underground, all of which are suitable for disabled access.

RankStationConnectionClassNotes
1BaşpınarLevelGaziantep Organized Industrial Zone
2OSB-3LevelGaziantep Organized Industrial Zone
3OSB-4LevelGaziantep Organized Industrial Zone
4DülükLevelDolice (Dülük) Ancient City
5StadyumLevelKalyon Stadium
6BeylerbeyiLevel
7FıstıklıkGaziantep Intercity Bus TerminalLevel
8SelimiyeLevelKayaönü
9AdliyeUndergroundGaziantep Courthouse, Şehitkamil State Hospital, TEDAŞ
10TopraklıkUnderground
11MücahitlerLevelDr. Ersin Arslan Training and Research Hospital, SANKO University Hospital, NCR International Hospital
12Gaziantep Railway Station (Gar)Gaziantep Tramway: LevelZeugma Mosaic Museum
13GöllüceLevelİnayet Topçuoğlu Hospital
14SeyrantepeLevelKüsget Industrial Zone
15Mustafa YavuzLevelKüsget Industrial Zone
16TaşlıcaLevelOduncular Industrial Zone

Rolling stock

TCDD E23000

Upon the line's opening in 2022, four E23000 class electric multiple units, manufactured by Hyundai Rotem, were put into service. These trains, taken from the Başkentray suburban rail network in Ankara, were introduced as a temporary solution to work the line until the delivery of the E39000 class trains ordered for the line in 2021 was completed.

TCDD E39000

In January 2021, eight four-car E39000 [tr] class trainsets were ordered from local manufacturer Türasaş for operation on the line. The first set was completed and presented in March 2025. As of November 2025, four sets have been delivered and are in use on the line.