| Kawagoe Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
E233-7000 series EMU operating on the Kawagoe Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Native name | 川越線 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Owner | JR East | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Locale | Saitama Prefecture | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Stations | 11 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Depot | Kawagoe | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Opened | 22 July 1940 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Line length | 30.6 km (19.0 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Track gauge | 1,067 mm (3 ft 6 in) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Electrification | Overhead line, 1,500 V DC | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The Kawagoe Line (Japanese: 川越線, Hepburn: Kawagoe-sen) is a railway line in Japan operated by the East Japan Railway Company (JR East), which connects the cities of Saitama, Kawagoe, and Hidaka in Saitama Prefecture. The main transfer stations on the line are Ōmiya, Kawagoe, and Komagawa.
The eastern section between Kawagoe and Ōmiya operates as an extension of the Saikyō Line, which runs between Ōmiya and Ōsaki in central Tokyo, using 10-car electric multiple unit (EMU) trains. Most trains continue through Ōsaki to Shin-Kiba via the Rinkai Line or to Ebina via the Saikyō, Shōnan-Shinjuku, and Sōtetsu Shin-Yokohama lines.
The western section between Kawagoe and Komagawa uses shorter four-car EMU trains, with about half of the trains continuing to Hachiōji via the Hachikō Line.
Because the two sections use different train lengths, there is no regular through service between Komagawa and Ōmiya. Except for a few rush-hour services that originate or terminate at Minami-Furuya, trains from Komagawa terminate at Kawagoe, as do trains from Ōmiya in the opposite direction. Passengers traveling beyond Kawagoe must change trains there.
| Station | Distance in km (mi) | Transfers | Track layout |
Location | ||
|---|---|---|---|---|---|---|
| Between stations |
Total | |||||
| ↑ Through-running to/from ↑ Shin-Kiba via the Saikyō and Rinkai lines Ebina via the Saikyō, Shōnan-Shinjuku and Sōtetsu Shin-Yokohama lines | ||||||
| Ōmiya 大宮 |
N/a | from Ōsaki: 36.9 (22.9) 0 (0) |
|
∥ | Ōmiya-ku | Saitama |
| Nisshin 日進 |
3.7 (2.3) | 3.7 (2.3) | ∨ | Kita-ku | ||
| Nishi-Ōmiya 西大宮 |
2.6 (1.6) | 6.3 (3.9) | ◇ | Nishi-ku | ||
| Sashiōgi 指扇 |
1.4 (0.87) | 7.7 (4.8) | ◇ | |||
| Minami-Furuya 南古谷 |
4.7 (2.9) | 12.4 (7.7) | ◇ | Kawagoe | ||
| Kawagoe 川越 |
3.7 (2.3) | 16.1 (10.0) |
|
◇ | ||
| Station | Distance in km (mi) | Transfers | Track layout |
Location | ||
|---|---|---|---|---|---|---|
| Between stations |
Total | |||||
| Kawagoe 川越 |
3.7 (2.3) | 16.1 (10.0) |
|
◇ | Kawagoe | |
| Nishi-Kawagoe 西川越 |
2.6 (1.6) | 18.7 (11.6) | | | |||
| Matoba 的場 |
2.2 (1.4) | 20.9 (13.0) | ◇ | |||
| Kasahata 笠幡 |
2.9 (1.8) | 23.8 (14.8) | | | |||
| Musashi-Takahagi 武蔵高萩 |
3.2 (2.0) | 27.0 (16.8) | ◇ | Hidaka | ||
| Komagawa 高麗川 |
3.6 (2.2) | 30.6 (19.0) | ■ Hachiko Line (through service) | ◇ | ||
| ↓ Through-running to/from Hachiōji via the Hachiko Line ↓ | ||||||
The electric multiple unit (EMU) fleet used on Kawagoe Line services is based at Kawagoe Depot (close to Minami-Furuya Station). The first of a fleet of 31 new 10-car E233-7000 series sets were introduced on Saikyo Line, Kawagoe Line, and Rinkai Line services between Kawagoe and Shin-Kiba from 30 June 2013, displacing all but one of the fleet of 205 series EMUs. The sole 205 series set was withdrawn from service in October 2016, then in 2019 seven more E233-7000 series sets entered service, bringing the total number of E233-7000's to 38.
From 2017, former E231-0 series ten-car sets based at Mitaka Depot for use on Chuo-Sobu Line services were reformed and converted to become four-car E231-3000 series sets based at Kawagoe for use on Kawagoe Line and Hachiko Line services. The first set entered revenue service on the line on 19 February 2018.
From 2018, former 209-500 series ten-car sets based at Mitaka Depot for use on Chuo-Sobu Line services were reformed and converted to become four-car 209-3500 series sets based at Kawagoe for use on Kawagoe Line and Hachiko Line services.
As of October 2016[update], all Saikyo Line 205 series sets have been removed from service.
A line linking Ōmiya with Kawagoe and continuing to the Hachikō Line at Komagawa was first proposed in March 1920. Construction work started in September 1935, with the line opening on 22 July 1940.
Services were initially steam hauled, but diesel multiple unit trains were introduced from 1 June 1950. The final steam-hauled passenger train ran on 30 September 1969.
The line was electrified (1,500 V DC) from 30 September 1985, and through running commenced to and from the Saikyō Line, which opened at the same time. The tracks were doubled between Ōmiya to Nisshin, and a new EMU depot was opened close to Minami-Furuya Station. A special "Kawagoe Line Diesel Sayonara" train ran on the line on 3 November 1985.
Through services between Kawagoe and Hachiōji on the Hachikō Line began on 16 March 1996 following the electrification of the southern section of the Hachikō Line between Komagawa and Hachiōji.