Sōbu Main Line

Sōbu Main Line
Overview
OwnerJR East
LocaleTokyo, Chiba prefectures
Termini
Stations22
Service
Operator(s)JR East, JR Freight
History
Opened20 July 1894; 132 years ago (1894-07-20)
Technical
Track gauge1,067 mm (3 ft 6 in)
ElectrificationOverhead line, 1,500 V DC
Route map
-
4.3
Ochanomizu
Akihabara
0.0
Tokyo
(R)Down"Sōbu Line (Rapid)"
Ryōgoku
4.8
0.0
Kinshichō
-
11.7
Etchūjima Freight
Kameido
LeftEtchūjima freight line
7.2
0.0
Shin-Koiwa
Shinkane freight line
-
8.9
Kanamachi
20.6
Nishi-Funabashi
26.7
Tsudanuma

Details east of Chiba
Rapids stop: R
with limited service: r
Commuter Rapids stop: C
(L)UpChūō-Sōbu Line
39.2
Chiba
(old) Chiba
LeftChiba Urban Monorail Line 2
40.1
Higashi-Chiba
  
LeftChiba Urban Monorail Line 1Up
43.4
Tsuga
RC
LeftChiba Urban Monorail Line 1Up
46.9
Yotsukaidō
RC
51.1
Monoi
R 
55.3
Sakura
RC
Narita LineRight
59.3
Minami-Shisui
r 
62.2
Enokido
r 
65.9
Yachimata
r 
71.7
Hyūga
r 
76.9
Narutō
r 
82.5
Matsuo
86.8
Yokoshiba
90.6
Iigura
93.7
Yōkaichiba
98.8
Higata
103.6
Asahi
106.3
Iioka
109.2
Kurahashi
111.8
Saruda
117.3
Matsugishi
120.5
Chōshi

The Sōbu Main Line (Japanese: 総武本線, Hepburn: Sōbu-honsen) is a Japanese railway line operated by the East Japan Railway Company (JR East) in Japan. It connects Tokyo with the east coast of Chiba Prefecture, passing through the cities of Funabashi, Chiba, and Chōshi. Its name derives from the old provinces of the area which it serves: Musashi (Japanese: 武蔵国), Shimōsa (Japanese: 下総国) and Kazusa (Japanese: 上総国). Its official line color is navy.

Definition

Formally, the Sōbu Main Line refers to the line from Tokyo to Chōshi.

However, informally, the character of the line changes at Chiba. The more urbanized section west of Chiba is informally, but commonly, called the Sōbu Line (Japanese: 総武線, Japanese pronunciation: [Sōbu sen]) without using "Main". The "Main Line", in popular usage, refers to the more rural section east of Chiba.

Route maps, signs at stations, in trains, and the vocal announcements all maintain this distinction: with Main for the eastern rural section; without Main for the western frequent travel zone.

Description

Operation

Services west of Chiba (Tokyo–Chiba)

Local trains operate between Ochanomizu Station in Tokyo and Chiba Station and are generally referred to as the Chūō–Sōbu Line or Sōbu-Local Line.

Rapid trains operate between Tokyo Station and Chiba using separate tracks from the local services. Some trains continue east of Chiba onto the Sōbu Main Line, while others continue west of Tokyo onto the Yokosuka Line. These services are generally referred to as the Sōbu Line (Rapid).

The local and rapid services run in parallel between Kinshichō and Chiba. West of Kinshichō, however, their routes diverge. Chūō-Sōbu Line trains continue west from Kinshichō to Ochanomizu via Akihabara on the Chūō Main Line, while Sōbu (Rapid) Line trains continue to Tokyo, with most continuing onto the Yokosuka Line.

For more information on services west of Chiba, see the articles on the Chūō–Sōbu Line and Sōbu Line (Rapid).

Services east of Chiba (Chiba–Chōshi)

The section between Chiba and Chōshi is commonly known as the Sōbu Main Line. Some Sōbu (Rapid) Line services continue east of Chiba, terminating at Sakura or Narutō, while others continue beyond Sakura onto the Narita Line to Narita Airport or Kashimajingū. Local trains also operate along the Sōbu Main Line between Chiba and Chōshi.

Limited express services

The Shiosai limited express service operates over the length of the Sōbu Main Line between Tokyo and Chōshi.

The Narita Express to Narita Airport uses the Sōbu Main Line between Tokyo and Chiba as part of its journey.

Stations

Tokyo / Ochanomizu - Kinshichō - Chiba

Here is a list of stations within this section. ([ ] denotes the Ochanomizu - Kinshicho section.) Tokyo - Shin-Nihombashi - Bakurochō [ Ochanomizu - Akihabara - Asakusabashi - Ryōgoku - Kinshichō ] Kameido - Hirai - Shin-Koiwa - Koiwa - Ichikawa - Moto-Yawata - Shimōsa-Nakayama - Nishi-Funabashi - Funabashi - Higashi-Funabashi - Tsudanuma - Makuharihongō - Makuhari - Shin-Kemigawa - Inage - Nishi-Chiba - Chiba

Chiba - Chōshi

For the connections of the line, see the route diagram.

From Chiba to Sakura, the section is double track; and from Sakura onwards to Choshi, the section is single track.

All stations on this section of the line are in Chiba Prefecture.

Legend:

No. Station Distance in km (mi)
Sōbu (Rapid)
Transfers Location
Between
stations
From Chiba From Tokyo
JO28 Chiba
千葉
N/a 0 (0) 39.2 (24.4) ● ●
Chūō-ku, Chiba
JO29 Higashi-Chiba
東千葉
0.9 (0.56) 0.9 (0.56) 40.1 (24.9) | | ■ Narita Line
JO30 Tsuga
都賀
3.3 (2.1) 4.2 (2.6) 43.4 (27.0) ● | Wakaba-ku, Chiba
JO31 Yotsukaidō
四街道
3.5 (2.2) 7.7 (4.8) 46.9 (29.1) ● ♦ ■ Narita Line Yotsukaidō
JO32 Monoi
物井
4.2 (2.6) 11.9 (7.4) 51.1 (31.8) ● | ■ Narita Line
JO33 Sakura
佐倉
4.2 (2.6) 16.1 (10.0) 55.3 (34.4) ● ● ■ Narita Line Sakura
Minami-Shisui
南酒々井
4.0 (2.5) 20.1 (12.5) 59.3 (36.8) | | Shisui
Enokido
榎戸
2.9 (1.8) 23.0 (14.3) 62.2 (38.6) | | Yachimata
Yachimata
八街
3.7 (2.3) 26.7 (16.6) 65.9 (40.9) ▲ ●
Hyūga
日向
5.8 (3.6) 32.5 (20.2) 71.7 (44.6) | | Sanmu
Narutō
成東
5.2 (3.2) 37.7 (23.4) 76.9 (47.8) ▲ ● ■ Tōgane Line
Matsuo
松尾
5.6 (3.5) 43.3 (26.9) 82.5 (51.3) |
Yokoshiba
横芝
4.3 (2.7) 47.6 (29.6) 86.8 (53.9) ● Yokoshibahikari
Iigura
飯倉
3.8 (2.4) 51.4 (31.9) 90.6 (56.3) | Sōsa
Yōkaichiba
八日市場
3.1 (1.9) 54.5 (33.9) 93.7 (58.2) ●
Higata
干潟
5.1 (3.2) 59.6 (37.0) 98.8 (61.4) | Asahi
Asahi
旭
4.8 (3.0) 64.4 (40.0) 103.6 (64.4) ●
Iioka
飯岡
2.7 (1.7) 67.1 (41.7) 106.3 (66.1) ●
Kurahashi
倉橋
2.9 (1.8) 70.0 (43.5) 109.2 (67.9) |
Saruda
猿田
2.6 (1.6) 72.6 (45.1) 111.8 (69.5) | Chōshi
Matsugishi
松岸
5.5 (3.4) 78.1 (48.5) 117.3 (72.9) | ■ Narita Line
Chōshi
銚子
3.2 (2.0) 81.3 (50.5) 120.5 (74.9) ●

Rolling stock

Limited express

Local/Rapid

Chūō-Sōbu Line

Sōbu Line (Rapid)

Sōbu Main Line

History

Private construction

Initially, the line was constructed by a private company, Sōbu Railway(Japanese: 総武鉄道, Japanese pronunciation: [Sōbu Tetsudō]). It opened the first service sections, between Ichikawa and Sakura on July 20, 1894, and extended to Tokyo City. In December of the same year, Honjo(Japanese: 本所, now Kinshichō) was opened, and in 1904, on the east bank of Sumida River, Ryōgokubashi (Japanese: 両国橋, now Ryōgoku) became a terminal of this line. The access routes to the west, to Tokyo City, were tramways for passengers and ships for freight. From Sahara to the east, this line reached another terminus, Chōshi in 1897.

Nationalisation

The line was nationalized in 1907 under the Railway Nationalization Act, and was double-tracked from Ryōgokubashi to Chiba the next year. The predecessor of the Japanese National Railways (JNR) planned to connect with other lines inside Tokyo. In 1932, a new passenger line was opened from Ochanomizu to Ryōgoku (with new platform besides the original terminal facility), and a frequent service of EMUs[clarification needed] commenced. Electrification to Chiba was completed in 1935, and local trains have run through from the Chūō line since then. But, except for a few trains, no rapid service was operated on this line, and the passengers had to use the local train, or its rival, Keisei Electric Railway.

Bombing of Tokyo

On March 10, 1945, the Bombing of Tokyo caused casualties estimated at 70,000–100,000, and destroyed stations of the line. During the last days of World War II in 1945, the Imperial Japanese Army thought the US Army would attempt a landing operation, "Operation Coronet", on Kujūkuri Beach, and transferred troops on the Sōbu Main Line.

Steam trains

Between Chiba and Chōshi, in the rural area of Chiba Prefecture, steam traction was used until recently. Fish and soy sauce from Chōshi were major freight items. Because Tokyo was close, JNR did not provide rapid or express trains from Ryōgoku to Chōshi until 1958. JNR operated tourist trains from Ryōgoku to the seaside resorts on the coast from the 1950s.

Five-destination operation

In the 1960s, JNR started the Five-Destination Operation (Japanese: 五方面作戦, Japanese pronunciation: [Go Hōmen Sakusen]) to steeply increase commuter demand, and it determined that a new rapid line would be constructed from Tokyo Station to Chiba. A new underground line from Tokyo to Kinshichō, and a four-tracked section to Tsudanuma were opened in 1972, and the operator began frequent rapid services from Tokyo to Chiba. The line was managed by the East Japan Railway Company (JR East) from 1987. The parallel Keiyō Line was opened closer to the coast in 1990. It was first constructed for freight services but later to carry passengers.

Further electrification

To the east of Chiba, electrification reached Chōshi in 1974, and Limited Express Shiosai has been operated from the underground Tokyo Station since 1975. Freight services from Chōshi ceased in 1986, just before the privatization of JNR, and regular passenger trains stopped using the Ryōgoku terminal platforms in 1988. JR East started a new airport train, the Narita Express in 1991. Rapid urbanization around Chiba Station made this section important for commuter traffic, for the city of Chiba, and for Greater Tokyo.

Former connecting lines

References

  1. ↑ This custom is also seen in Chūō Main Line and less in Tōkaidō Main Line